Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $20,000, use sole source.
Coops: Use an NYS OGS centralized contract to buy directly and bypass local bidding.
Town of Peru, NY. There is no evidence of sole source awards above the procurement threshold in 2021–2024; deprioritize this route and pivot to cooperative contracts.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Town of Peru's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Budget Officer
Court Clerk
Town Engineer
Interim Code Enforcement Officer
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Town of Peru
The project consists of the replacement of an existing culvert located near the northern end of Lyons Road in the Town of Peru, Clinton County, NY. The culvert conveys the Silver Stream from west to east. The existing culvert consists of one (1) 84" diameter corrugated metal pipe (CMP), running approx. 44 LF, and will be replaced with a 17'-0" x 8'-6" (clear dimensions) pre-cast concrete box culvert, embedded 21" into the streambed on the upstream site and 18" on the downstream side, providing 17'-0" x 6'-9" min open clear area. The material costs of the new culvert structure, including wingwalls, as well as delivery to the site of the new precast structures, will be by others and are not to be included in the bid.
Posted Date
Jan 16, 2026
Due Date
Feb 20, 2026
Release: Jan 16, 2026
Town of Peru
Close: Feb 20, 2026
The project consists of the replacement of an existing culvert located near the northern end of Lyons Road in the Town of Peru, Clinton County, NY. The culvert conveys the Silver Stream from west to east. The existing culvert consists of one (1) 84" diameter corrugated metal pipe (CMP), running approx. 44 LF, and will be replaced with a 17'-0" x 8'-6" (clear dimensions) pre-cast concrete box culvert, embedded 21" into the streambed on the upstream site and 18" on the downstream side, providing 17'-0" x 6'-9" min open clear area. The material costs of the new culvert structure, including wingwalls, as well as delivery to the site of the new precast structures, will be by others and are not to be included in the bid.
AvailableTown of Peru
The project consists of the replacement of an existing culvert located on Fuller Road, approx. 1/3 of a mile north of the intersection of Bear Swamp Road (State Route 442) and Fuller Road, in the Town of Peru, Clinton County, NY. The culvert conveys an Unnamed Tributary to the Little Ausable River from west to east. The existing culvert consists of one (1) 72??diameter corrugated metal pipe (CMP), running approx. 69 LF, and will be replaced with a 10'-0'?x 8'-6? (clear dimensions) pre-cast, concrete box culvert, embedded 24??into the streambed to provide a 10'-0??W x 6'-6??H clear opening. The material costs of the new precast culvert structure, including precast wingwalls, as well as delivery to the site of the new precast structures, will be by others and are not to be included in the bid.
Posted Date
Aug 21, 2025
Due Date
Sep 11, 2025
Release: Aug 21, 2025
Town of Peru
Close: Sep 11, 2025
The project consists of the replacement of an existing culvert located on Fuller Road, approx. 1/3 of a mile north of the intersection of Bear Swamp Road (State Route 442) and Fuller Road, in the Town of Peru, Clinton County, NY. The culvert conveys an Unnamed Tributary to the Little Ausable River from west to east. The existing culvert consists of one (1) 72??diameter corrugated metal pipe (CMP), running approx. 69 LF, and will be replaced with a 10'-0'?x 8'-6? (clear dimensions) pre-cast, concrete box culvert, embedded 24??into the streambed to provide a 10'-0??W x 6'-6??H clear opening. The material costs of the new precast culvert structure, including precast wingwalls, as well as delivery to the site of the new precast structures, will be by others and are not to be included in the bid.
Town of Peru
Work for the Mechanical Contract includes demolition, improvements, construction, and miscellaneous mechanical improvements to HVAC systems for the upgrade of the Water Pollution Control Plant and construction of a new administration and treatment building and vehicle storage garage.
Posted Date
Mar 8, 2025
Due Date
Mar 28, 2025
Release: Mar 8, 2025
Town of Peru
Close: Mar 28, 2025
Work for the Mechanical Contract includes demolition, improvements, construction, and miscellaneous mechanical improvements to HVAC systems for the upgrade of the Water Pollution Control Plant and construction of a new administration and treatment building and vehicle storage garage.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.