2026 Bell Avenue Drainage Improvements RFP
Aug 12, 2026
Closes
Aug 27, 2026
Project consists of the replacement of existing storm facilities. work includes removing existing corrugated metal pipes and replacing with HDPE. Existing inlets will be replaced with concrete catch basins and additional Nyloplast catch basins will be installed. The work also includes replacement of a fire hydrant assembly at Oak Creek Town Hall. There is also concrete work including removing and replacing concrete sidewalk and curb and gutter at Town Hall and installation of a concrete curb ramp.