Town of Nutter Fort - Nutter Fort AMD Stormwater Phase II
Jul 31, 2026
Closes
Sep 10, 2026
Dewatering of mine via horizonal bore and curtain drains. Bores are 12" fused HDPE pipe and may total 2,900' if all proposed bores are deemed necessary. Curtain drains are approx. 1,250 LF of 12" PVC. Installation of a stormwater conveyance system that includes new installation and removal and replacement of existing stormwater system features. Stormwater system includes approx. 6,400 LF of 12" - 72" pipe, lining of 2 existing culverts, concrete inlets, manholes, and wingwalls, tie-ins, utility relocations of water and sewer lines, arbutus park drive slope stabilization, trench repairs, and surface restorations.