Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Merrill
Approx. 1.0 mile of roadway (patch work/sections of road) Approx. 20 feet wide. 2" lift of 12.5 mm DOT Base Mix. One (1) 1½-inch lift of 12.5 mm DOT Surface Mix. Ground and tack at project starting point Sweep and tack on existing surface.
Posted Date
Jul 4, 2026
Due Date
Jul 10, 2026
Release: Jul 4, 2026
Town of Merrill
Close: Jul 10, 2026
Approx. 1.0 mile of roadway (patch work/sections of road) Approx. 20 feet wide. 2" lift of 12.5 mm DOT Base Mix. One (1) 1½-inch lift of 12.5 mm DOT Surface Mix. Ground and tack at project starting point Sweep and tack on existing surface.
AvailableTown of Merrill
Work includes mowing and related maintenance work.
Posted Date
Apr 3, 2023
Due Date
Apr 3, 2026
Release: Apr 3, 2023
Town of Merrill
Close: Apr 3, 2026
Work includes mowing and related maintenance work.
Town of Merrill
Work include road repair. Repairs to include dirt fill (if necessary), geotextile fabric, rip rap, and any other required materials/work.
Posted Date
Oct 29, 2025
Due Date
Nov 14, 2025
Release: Oct 29, 2025
Town of Merrill
Close: Nov 14, 2025
Work include road repair. Repairs to include dirt fill (if necessary), geotextile fabric, rip rap, and any other required materials/work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge