Contract 2 Chemical Building Upgrades
-
Closes
Aug 26, 2026
Project consists construction of a twelve-foot extension to the existing chemical building, installation of an oxiplus manganese filter system, small backwash lift station, approximately 600 LF of forcemain to existing lisbon sewer system, new instrumentation and controls.
