Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of La Veta
Work includes approx 150 LF of 8" sewer line.
Posted Date
May 28, 2026
Due Date
Jun 18, 2026
Release: May 28, 2026
Town of La Veta
Close: Jun 18, 2026
Work includes approx 150 LF of 8" sewer line.
AvailableTown of La Veta
Work includes site work, 1 LS precast concrete foundation drain sump manhole, 1 LS 10" c900 pvc raw water piping (pressure piping), 1 ls 10" c900 pvc drain piping (pressure piping), 1 LS 10" c900 pvc finished water piping (pressure piping), 1 LS 8" ductile iron overflow piping, 1 LS 8-inch gravity sdr 35 pvc and 8" hdpe dr11 ips sanitary sewer main and new 4-foot id precast concrete sanitary sewer manholes (total of 5). See attached file.
Posted Date
-
Due Date
Feb 26, 2026
Release: -
Town of La Veta
Close: Feb 26, 2026
Work includes site work, 1 LS precast concrete foundation drain sump manhole, 1 LS 10" c900 pvc raw water piping (pressure piping), 1 ls 10" c900 pvc drain piping (pressure piping), 1 LS 10" c900 pvc finished water piping (pressure piping), 1 LS 8" ductile iron overflow piping, 1 LS 8-inch gravity sdr 35 pvc and 8" hdpe dr11 ips sanitary sewer main and new 4-foot id precast concrete sanitary sewer manholes (total of 5). See attached file.
Town of La Veta
Work generally consisting of earthwork in moving dried biosolid materials between cells to facilitate breaking up the clay lining, dismantling the surrounding berms, recover fill material from ood protection bags, and integrating the biosolids. Clay liner, and berm materials into the soil through thorough mixing; rough grading to design contours; final grading will generally match the existing ground terrain contours; reseeding with a native grass seed mix; together with appurtenances and incidentals of construction.
Posted Date
Sep 25, 2025
Due Date
Oct 30, 2025
Release: Sep 25, 2025
Town of La Veta
Close: Oct 30, 2025
Work generally consisting of earthwork in moving dried biosolid materials between cells to facilitate breaking up the clay lining, dismantling the surrounding berms, recover fill material from ood protection bags, and integrating the biosolids. Clay liner, and berm materials into the soil through thorough mixing; rough grading to design contours; final grading will generally match the existing ground terrain contours; reseeding with a native grass seed mix; together with appurtenances and incidentals of construction.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge