Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Sole Source: Do not pursue; pivot immediately to coops.
Coops: Use Sourcewell or BuyBoard to fast-track the purchase. If coops can’t be used: Monitor the Oklahoma Bid Network and the Town’s site for a formal bid and prepare a competitive response.
Town of Jones (OK): No evidence of sole source contracting in public records. Avoid this path; a justification is likely to fail.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Town of Jones's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Building Inspector
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Town of Jones
Work includes 4,005 LF 12" pvc sdr 26 sewer main, 700 LF 8" pvc sdr 26 sewer main, 16 EA 4' inside dia concrete manhole, 73 EA 4' id manhole over 6' deep, 58 EA sewer service reconnection, 1,020 LF asphalt surface repair, 240 LF concrete surface repair, 3,100 SY solid slab sodding, 1 LS erosion control, 1 LS sewer flow control, 1 LS traffic control.
Posted Date
Jan 15, 2026
Due Date
Feb 6, 2026
Release: Jan 15, 2026
Town of Jones
Close: Feb 6, 2026
Work includes 4,005 LF 12" pvc sdr 26 sewer main, 700 LF 8" pvc sdr 26 sewer main, 16 EA 4' inside dia concrete manhole, 73 EA 4' id manhole over 6' deep, 58 EA sewer service reconnection, 1,020 LF asphalt surface repair, 240 LF concrete surface repair, 3,100 SY solid slab sodding, 1 LS erosion control, 1 LS sewer flow control, 1 LS traffic control.
AvailableTown of Jones
Work includes 2 EA replace brush aerator control panel; 1 LS replace bar screen control panel; 1 LS replace bar screen brushes; 1 LS replace disc aerator bearings; 1 LS clarifier gearbox oil change; 1 LS calibrate weirs for even flow distribution; 1 LS replace primary and provide backup chlorine pump; 1 LS replace primary and provide backup sodium bisulfate pump; 1 LS replace ultrasonic flow meter; 1 LS reroute chlorine plumbing under concrete; 1 LS chlorine and sodium bisulfate chemical feed setup; 3 EA replace 4" drying bed plug valves; 1 LS replace anthracite and gravel media in drying beds. See attached file.
Posted Date
Oct 30, 2025
Due Date
Nov 20, 2025
Release: Oct 30, 2025
Town of Jones
Close: Nov 20, 2025
Work includes 2 EA replace brush aerator control panel; 1 LS replace bar screen control panel; 1 LS replace bar screen brushes; 1 LS replace disc aerator bearings; 1 LS clarifier gearbox oil change; 1 LS calibrate weirs for even flow distribution; 1 LS replace primary and provide backup chlorine pump; 1 LS replace primary and provide backup sodium bisulfate pump; 1 LS replace ultrasonic flow meter; 1 LS reroute chlorine plumbing under concrete; 1 LS chlorine and sodium bisulfate chemical feed setup; 3 EA replace 4" drying bed plug valves; 1 LS replace anthracite and gravel media in drying beds. See attached file.
Town of Jones
Work consist of 3,300 LF of 12" pvc water main, 10 LF of 6" PVC water main, 1,410 LF of directional bore & install 12" water main, 35 LF of directional bore & install 6" water main, 8 EA of PVC to pe transition, 55 LF of bore & install 18" steel casing, 450 LF of slick bore, 88 SY of gravel repair, 6 SY of remove & repair concrete, 1 EA of 12" interconnection, 10 EA of 12" gate valve & box, 2,200 SY of solid slab sodding, 7 EA of 6" fire hydrant assembly, 3 EA of 2" air/vacuum release valve. See attached file.
Posted Date
-
Due Date
Nov 20, 2025
Release: -
Town of Jones
Close: Nov 20, 2025
Work consist of 3,300 LF of 12" pvc water main, 10 LF of 6" PVC water main, 1,410 LF of directional bore & install 12" water main, 35 LF of directional bore & install 6" water main, 8 EA of PVC to pe transition, 55 LF of bore & install 18" steel casing, 450 LF of slick bore, 88 SY of gravel repair, 6 SY of remove & repair concrete, 1 EA of 12" interconnection, 10 EA of 12" gate valve & box, 2,200 SY of solid slab sodding, 7 EA of 6" fire hydrant assembly, 3 EA of 2" air/vacuum release valve. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.