Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Freeport
DESIGN-BUILD. Provide interior design and construction/installation services for the renovation of three distinct areas of the library over the next three fiscal years. Youth Services in FY27, Lending Services/Lobby/Sta Workroom in FY28, and the Adult Services Reading/Stacks area in FY29. The allocated funds for these projects in the Capital Improvement Plan are $165k (FY27), $270k (FY28), and $145k (FY29), respectively.
Posted Date
Jun 18, 2026
Due Date
Jul 9, 2026
Release: Jun 18, 2026
Town of Freeport
Close: Jul 9, 2026
DESIGN-BUILD. Provide interior design and construction/installation services for the renovation of three distinct areas of the library over the next three fiscal years. Youth Services in FY27, Lending Services/Lobby/Sta Workroom in FY28, and the Adult Services Reading/Stacks area in FY29. The allocated funds for these projects in the Capital Improvement Plan are $165k (FY27), $270k (FY28), and $145k (FY29), respectively.
AvailableTown of Freeport
To renovate six (6) of the public restrooms at the Winslow park bathhouse. including painting of all walls and ceilings (not doors), new epoxy floor (with fleck) in each bathroom, and replacement of existing bathroom fans with a new appropriately sized unit in each bathroom. Each bathroom will also have the following installed for six total each: replacement windows, replacement elongated toilets, new ADA compliant door hardware, replacement shower stalls within existing space (rough valve & simple on/off valve to meet code), new ADA compliant stainless steel wall mounted sinks, new stainless steel sink faucets (must be ADA and UPC compliant for public restrooms), alterations as needed for hot and cold water pipe modifications. In one of the six units (closest to the accessible parking spaces), all alterations will be required to comply with ADA. This will also require the removal of a non-load bearing wall to make space for the ADA compliant shower. In addition, the project will include the installation of new piping modifications in mechanical room for both hot and cold water.
Posted Date
Nov 12, 2025
Due Date
Dec 30, 2025
Release: Nov 12, 2025
Town of Freeport
Close: Dec 30, 2025
To renovate six (6) of the public restrooms at the Winslow park bathhouse. including painting of all walls and ceilings (not doors), new epoxy floor (with fleck) in each bathroom, and replacement of existing bathroom fans with a new appropriately sized unit in each bathroom. Each bathroom will also have the following installed for six total each: replacement windows, replacement elongated toilets, new ADA compliant door hardware, replacement shower stalls within existing space (rough valve & simple on/off valve to meet code), new ADA compliant stainless steel wall mounted sinks, new stainless steel sink faucets (must be ADA and UPC compliant for public restrooms), alterations as needed for hot and cold water pipe modifications. In one of the six units (closest to the accessible parking spaces), all alterations will be required to comply with ADA. This will also require the removal of a non-load bearing wall to make space for the ADA compliant shower. In addition, the project will include the installation of new piping modifications in mechanical room for both hot and cold water.
Town of Freeport
New 2024-2025 sidewalk machine with attachments.
Posted Date
Aug 11, 2025
Due Date
Sep 2, 2025
Release: Aug 11, 2025
Town of Freeport
Close: Sep 2, 2025
New 2024-2025 sidewalk machine with attachments.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; expect a formal public bid instead.
Coops: If they’re open to coops, mention Sourcewell, PEPPM, GPCOG, and NASPO ValuePoint as pre-competed options.
Town of Freeport (ME): No evidence of sole source contracting in public records—deprioritize this path.
Board meetings and strategic plans from Town of Freeport
The board discussed updates regarding design review workshops and net residential acreage definition amendments. The primary project discussed was the Jackson Hill subdivision, involving a four-lot development proposal. The discussion focused on road infrastructure, stormwater management compliance, and the installation of a fire cistern to provide emergency water access as an alternative to requiring residential sprinklers.
The board discussed the Library Director's report, including a $10,000 Carnegie Library Grant, updates on the library capital and operating budgets, and the status of facility repairs, specifically the siding project and window maintenance. Other topics included the success of recent library collaborations, the start of new programming like the birding series, the seasonal launch of the Electric Tool Library, and summer reading program preparations. The board also discussed potential future sponsorship of a scam awareness program and organizational matters regarding upcoming board officer elections.
The committee discussed a directive from the Town Council Finance Committee regarding a proposed seasonal fee increase. It was determined that the current proposal of increasing the fee from $100 to $105 was insufficient, necessitating a more comprehensive review to be conducted by the Advisory Committee prior to their next scheduled session.
The council discussed various announcements including changes to town hall operating hours, recycling bin removals, new public works procedures, and summer music events. Information exchange covered the implementation of the Boston Post Cane award policy and the postponement of a community cookout. The council further debated the structural integrity and lease status of the Dunning Boat Yard, evaluating options for retrofitting the building or potential liability concerns, with further recommendations to be finalized after additional engineering assessments.
The council focused on the adoption of the fiscal year 2027 budget. Key actions included the acceptance of state funds, the approval of operating budgets for Winslow Park and the town, and the adoption of the municipal capital budget. Appropriations were approved for various departments, projects, and specific tax increment finance districts.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of Freeport's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge