Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Brighton
The Town of Brighton, Vermont is requesting bids for the Island Pond Lakeside Park Improvements project. The work includes landscaping, hardscaping, lighting, and pathway construction to improve accessibility and the park's appearance, with substantial completion expected within approximately 45 calendar days. The project is located at Lakeside Park in Island Pond, Vermont, and the response deadline is September 1, 2026.
Posted Date
Jul 24, 2026
Due Date
Sep 1, 2026
Release: Jul 24, 2026
Town of Brighton
Close: Sep 1, 2026
The Town of Brighton, Vermont is requesting bids for the Island Pond Lakeside Park Improvements project. The work includes landscaping, hardscaping, lighting, and pathway construction to improve accessibility and the park's appearance, with substantial completion expected within approximately 45 calendar days. The project is located at Lakeside Park in Island Pond, Vermont, and the response deadline is September 1, 2026.
AvailableTown of Brighton
Coordination with Digsafe. Location and mapping of existing utilities in the project area. Contractor must be familiar with high risk, tight digs, and preferably have experience with jetting capabilities. Must use certified flagging company during any work within the roadway Coordination with Vermont Electric Coop to stabilize a utility pole adjacent to project area. Coordination with H2O innovation for water shut off and relieve pressure from system. Removal of abandoned pipe off mainline. Perform all pressure testing and backfill of area to ensure stabilization and future integrity of line. Coordinate line flushing and boil water notice with businesses, operators, and board. Complete cleanup and site preparation for concrete, topsoil, seed and hay. Be sure to advise H2O Innovation when water quality testing is needed.
Posted Date
-
Due Date
May 13, 2026
Release: -
Town of Brighton
Close: May 13, 2026
Coordination with Digsafe. Location and mapping of existing utilities in the project area. Contractor must be familiar with high risk, tight digs, and preferably have experience with jetting capabilities. Must use certified flagging company during any work within the roadway Coordination with Vermont Electric Coop to stabilize a utility pole adjacent to project area. Coordination with H2O innovation for water shut off and relieve pressure from system. Removal of abandoned pipe off mainline. Perform all pressure testing and backfill of area to ensure stabilization and future integrity of line. Coordinate line flushing and boil water notice with businesses, operators, and board. Complete cleanup and site preparation for concrete, topsoil, seed and hay. Be sure to advise H2O Innovation when water quality testing is needed.
Town of Brighton
Seeking proposals from qualified contractors to install a new cold-climate heat pump system that will cover the occupied space. Due to the extreme cold temperatures experienced in Brighton during the winter months, the existing boiler system will be retained to provide ambient temperature control with the heat pump system serving as the primary heating and only cooling option. Additionally, install remotely accessible, fully programmable thermostats for the heat pump system.
Posted Date
Mar 13, 2026
Due Date
Apr 6, 2026
Release: Mar 13, 2026
Town of Brighton
Close: Apr 6, 2026
Seeking proposals from qualified contractors to install a new cold-climate heat pump system that will cover the occupied space. Due to the extreme cold temperatures experienced in Brighton during the winter months, the existing boiler system will be retained to provide ambient temperature control with the heat pump system serving as the primary heating and only cooling option. Additionally, install remotely accessible, fully programmable thermostats for the heat pump system.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Town of Brighton
The board discussed and took action on several items, including opening the brush dump, authorizing roof repairs for the railroad depot, and reviewing updates on the MERP project. Policy reviews were conducted regarding burn, ATV, and dog ordinances, and the authorization of overweight permits was approved. The board awarded multiple contracts for the MERP HVAC and water heater upgrades, as well as the town hall painting project, to various contractors. Additionally, the board decided to consolidate all town accounts at Community National Bank, authorized a new town credit card account with specific user limits, and entered executive sessions to discuss personnel and various contract proposals.
The board discussed the transition of the Cross Street project from an RFP to a bid process, including establishing relevant bid deadlines. Updates were provided regarding the stocking of the trailer, the meter replacement schedule, the reservoir lining timeline, and the status of WWTF and water treatment funding and audits. Additionally, the board addressed stream run-off mitigation, reviewed water, sewer, and operations pay orders, and debated strategies and funding sources for hydrant replacements. An executive session was conducted to discuss past due account matters.
The board discussed and authorized an emergency public health order for property cleanup and associated liens at 38 Curran Avenue. The members ratified a Collective Bargaining Agreement with AFSCME Local 24133. The board also voted to cover waste disposal fees for refrigerators and air conditioners for local residents. A proposal for town-funded curb appeal grants was reviewed, with the board concluding that further information is needed and that the matter requires voter consideration. Additional business included the authorization of overweight permits, a review of general and road department expense pay orders, and preliminary discussion regarding potential changes to the burn ordinance.
The board discussed the Request for Proposal process for the Cross Street Project and reviewed quotes for trailer stocking, noting that adjustments are required. A purchase of a safety harness was authorized. The board reviewed plans for hiring an outside firm to assist with meter installations to improve billing system communication. Progress updates were provided for the Wastewater Treatment Facility and Water Treatment projects, with the latter involving a kickoff meeting with engineers and pending loan documentation. A truck cap purchase was confirmed. Additionally, the board approved the purchase of specific tools for clearing frozen sewer lines to reduce outsourcing costs and formally adopted the proposed budget figures for Water, Sewer, and Water/Sewer Operations.
The board discussed various infrastructure and project updates, including railroad depot roof repairs, town hall painting, underground storage tank excavation, and MERP grant projects such as window replacements and electrical quotes. Updates were provided on park project agreements and broadband service area maps. The board reviewed and adopted a revised Procurement Policy, authorized the signing of overweight permits, and signed pay orders for road and general expense accounts. Additionally, the board addressed maintenance for the fire station parking lot and received an update on upcoming summer Recreation Department activities.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of Brighton's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge