South Boneta Pipeline Project
Posted
Sep 25, 2026
Oct 15, 2026
Project generally consists of enclosing approx., 2.5 miles of open canal by installing an irrigation pipeline to the existing irrigation system pipelines and pond. The work includes associated pipeline appurtenances, including air/vacuum valves, meters, pressure-control valves, flow-control valves, flush outlet, pond outlet, connections to the existing irrigation system, and related work shown or specified in the contract documents.
