Upper East Zayante PM 1.18 Storm Damage Repair Project RFP
Posted
Oct 15, 2026
Nov 12, 2026
Work includes 2 EA portable signal systems (ea); 200 LF temporary traffic stripe (paint); 75 LF temporary barrier system; 125 LF temporary reinforced silt fence; 1 ls contractor-supplied biologist (ls); 24 CY structure excavation (soldier pile wall); 16 CY structure backfill (soldier pile wall); 13 CY lean concrete backfill; 300 LF steel soldier pile (w14x82); 1 LS clean and paint steel soldier piling; 10 EA guard railing delineator; 93.75 LF midwest guardrail system (steel post); 2 LS alternative in-line terminal system (tl-2); 800 SF rolled erosion control product (jute mesh). See attached file.