Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Sacramento County, Water Resources Dept. (Sacramento County Water Agency)
The consultant shall furnish all labor, materials, equipment, and incidentals necessary to perform professional engineering services on an as-needed basis.
Posted Date
Jul 23, 2026
Due Date
Sep 14, 2026
Release: Jul 23, 2026
Sacramento County, Water Resources Dept. (Sacramento County Water Agency)
Close: Sep 14, 2026
The consultant shall furnish all labor, materials, equipment, and incidentals necessary to perform professional engineering services on an as-needed basis.
AvailableSacramento County, Water Resources Dept. (Sacramento County Water Agency)
Work includes brush and bail 40 hr, post rehab video 1 ls, vertical turbine pump nsf 61 certified 1 ls, uncoated water lube 10" column pipe 160 lf, sounding tube 1 ls.
Posted Date
Nov 5, 2025
Due Date
Nov 20, 2025
Release: Nov 5, 2025
Sacramento County, Water Resources Dept. (Sacramento County Water Agency)
Close: Nov 20, 2025
Work includes brush and bail 40 hr, post rehab video 1 ls, vertical turbine pump nsf 61 certified 1 ls, uncoated water lube 10" column pipe 160 lf, sounding tube 1 ls.
Sacramento County, Water Resources Dept. (Sacramento County Water Agency)
Work includes 280 LF power-wash existing column pipe exterior, brush column pipe interior using a matching dia stiff nylon brush, and wash interior and exterior with a 50 ppm hypochlorite solution. 280 LF replace existing column pipe with 10" schedule 40 steel, threaded and coupled. 280 LF power-wash existing column pipe exterior, brush column pipe interior using a matching dia stiff nylon brush, and wash interior and exterior with a 50 ppm hypochlorite solution. See attached file.
Posted Date
Jul 29, 2025
Due Date
Sep 4, 2025
Release: Jul 29, 2025
Sacramento County, Water Resources Dept. (Sacramento County Water Agency)
Close: Sep 4, 2025
Work includes 280 LF power-wash existing column pipe exterior, brush column pipe interior using a matching dia stiff nylon brush, and wash interior and exterior with a 50 ppm hypochlorite solution. 280 LF replace existing column pipe with 10" schedule 40 steel, threaded and coupled. 280 LF power-wash existing column pipe exterior, brush column pipe interior using a matching dia stiff nylon brush, and wash interior and exterior with a 50 ppm hypochlorite solution. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge