Poughkeepsie City Hall Parking Garage Repairs
Aug 14, 2026
Closes
Sep 23, 2026
Work consist of 600 sf of repair shallow floor spalls and delaminations, 4 ea of trench drain concrete repair, 13 ea of guardrail curb and post repair, 800 sf of 50 lf of full joist repair, 25 lf of rout and seal elevated floor cracks, 1,000 lf of epoxy inject cracks, install steel beams for generator room, 14 ea of replace drain system, 1 ea of replace trench drain strainer, 8 ea of replace drain strainer, 600 sf of repair shallow floor spalls and delaminations, 1,400 lf of install/replace joint sealant. See attached file.
