Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
School mascot.
Total number of staff members.
Highest grade level offered.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Platte County School District 1
DESIGN/BUILD: The work includes select interior demolition in the boy’s bathroom, the girl's bathroom, and an existing plumbing and mechanical room located between the two bathrooms in the highschool to replace a section of sewer line that is damaged. Sewer investigations indicate a section of damaged sewer line located below the slab between the boy's and girl's bathroom. Due to blockages in the pipe, the entire segment of sewer line was investigated. The goal of the project is to locate and repair the damaged and/or collapsed section of under slab sewer line. Replacement of laterals or branch lines are not included in the scope of the project. Demolition includes removal of floor slabs, removal and select reinstallation of existing bathroom fixtures and furnishings, excavation below the slab to expose the existing sewer line, repair of the existing sewer line and reconnection of existing laterals, backfilling and replacement of the floor slab, new flooring and select wall finished, and the reinstallation of select fixtures and furnishings, and the installation of new furnishings. Demolition shall be limited to the rooms described above.
Posted Date
Jun 30, 2026
Due Date
Aug 10, 2026
Release: Jun 30, 2026
Platte County School District 1
Close: Aug 10, 2026
DESIGN/BUILD: The work includes select interior demolition in the boy’s bathroom, the girl's bathroom, and an existing plumbing and mechanical room located between the two bathrooms in the highschool to replace a section of sewer line that is damaged. Sewer investigations indicate a section of damaged sewer line located below the slab between the boy's and girl's bathroom. Due to blockages in the pipe, the entire segment of sewer line was investigated. The goal of the project is to locate and repair the damaged and/or collapsed section of under slab sewer line. Replacement of laterals or branch lines are not included in the scope of the project. Demolition includes removal of floor slabs, removal and select reinstallation of existing bathroom fixtures and furnishings, excavation below the slab to expose the existing sewer line, repair of the existing sewer line and reconnection of existing laterals, backfilling and replacement of the floor slab, new flooring and select wall finished, and the reinstallation of select fixtures and furnishings, and the installation of new furnishings. Demolition shall be limited to the rooms described above.
AvailablePlatte County School District 1
Work includes, but is not limited to: gym mortar repair, hardwood floor replacement.
Posted Date
May 13, 2026
Due Date
Jun 9, 2026
Release: May 13, 2026
Platte County School District 1
Close: Jun 9, 2026
Work includes, but is not limited to: gym mortar repair, hardwood floor replacement.
Platte County School District 1
Demolition and renovation of finishes, fixtures, mechanical, electrical, plumbing, structural steel and wood, roofing, other finishes, systems, and components.
Posted Date
May 11, 2026
Due Date
May 26, 2026
Release: May 11, 2026
Platte County School District 1
Close: May 26, 2026
Demolition and renovation of finishes, fixtures, mechanical, electrical, plumbing, structural steel and wood, roofing, other finishes, systems, and components.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Platte County School District 1
The board discussed the inclusion of sixth graders in school sports, focusing on concerns regarding skill levels, sportsmanship, and potential financial implications for equipment and coaching. The board also reviewed proposals for new stadium bleacher seating, evaluating the comfort of chair-style versus bench-style seating and the impact on overall seating capacity within the facility.
The board conducted an election for the position of school board clerk and appointed a new trustee to fill a vacancy. Key discussion topics included facilities and maintenance summer projects, policy evaluations regarding graduation requirements, student data privacy, and travel reimbursements. The board approved charging for home athletics events, amendments to the depreciation fund, and various personnel actions. Additionally, the board approved an audiologist contract, a fuel bid, a salary scale for the upcoming academic year, and a superintendent contract addendum. Executive sessions were held to consider the appointment of a public officer and to complete the superintendent evaluation.
The board meeting covered several agenda items, including updates on athletics and coaching positions. Presentations were delivered by student council members regarding student achievements and the Hunger Initiative to address school lunch debt. The board discussed potential impacts of a new recalibration bill on staffing ratios, considered student feedback regarding eligibility criteria for academic awards, and reviewed the Glendo alternative calendar, noting community support for a four-day school week and the process for upcoming public hearings.
The board discussed the election of a school board clerk and approved the meeting agenda. Key topics included a business manager report regarding an amendment to the depreciation fund to comply with new legislative restrictions on facility expenditures, as well as a facilities and maintenance update covering various summer projects at district schools, such as cleaning, painting, HVAC improvements, playground equipment installation, and sewer repairs. Additionally, the board initiated a process for policy evaluation and entered an executive session to interview candidates for an open position.
The board meeting included recognition of the Glendo preschool graduation, a review of the consent agenda, and detailed financial updates regarding the district's budget, revenue, and expenditures. Key discussions focused on depreciation reserve allocations, challenges with the average daily membership funding model due to charter school enrollment, and the legislative rule-making process regarding gun-free zones. Additionally, the board engaged in policy evaluation and acted on personnel items, including hiring, resignations, and terminations.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Platte County School District 1's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge