Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
Total number of staff members.
Highest grade level offered.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Park County School District 1's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Instructional Facilitator
Superintendent
Instructional Facilitator
Principal, Parkside Elementary School
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Park County School District 1
Work of the project includes removing the existing membrane, the installation of a nominal 50-mil fibertite mechanically fastened single-ply membrane roofing system, a min. 1/4" thick cover board, Polyisocyanurate insulation to create grade, and the required attachments to furnish a 20-year warranty on an existing 50,000 SF roof. All existing Polyisocyanurate insulation is intended to be reused, but work will also include evaluating the existing Polyisocyanurate insulation to identify any areas where its condition may make it unsuitable for reuse. If any damaged, deteriorated, wet, or inadequate insulation is found, the engineer should be notified immediately to determine whether it should be removed and replaced. Engineer anticipates that up to approx. 10% of the insulation may need to be replaced.
Posted Date
Jan 20, 2026
Due Date
Mar 3, 2026
Release: Jan 20, 2026
Park County School District 1
Close: Mar 3, 2026
Work of the project includes removing the existing membrane, the installation of a nominal 50-mil fibertite mechanically fastened single-ply membrane roofing system, a min. 1/4" thick cover board, Polyisocyanurate insulation to create grade, and the required attachments to furnish a 20-year warranty on an existing 50,000 SF roof. All existing Polyisocyanurate insulation is intended to be reused, but work will also include evaluating the existing Polyisocyanurate insulation to identify any areas where its condition may make it unsuitable for reuse. If any damaged, deteriorated, wet, or inadequate insulation is found, the engineer should be notified immediately to determine whether it should be removed and replaced. Engineer anticipates that up to approx. 10% of the insulation may need to be replaced.
AvailablePark County School District 1
Work of the project includes removing the existing membrane, the installation of a nominal 50-mil fibertite mechanically fastened single-ply membrane roofing system, a min. 1/4" thick cover board, Polyisocyanurate insulation to create grade, and the required attachments to furnish a 20-year warranty on an existing 20,000 SF roof. All existing Polyisocyanurate insulation is intended to be reused, but work will also include evaluating the existing Polyisocyanurate insulation to identify any areas where its condition may make it unsuitable for reuse. If any damaged, deteriorated, wet, or inadequate insulation is found, the engineer should be notified immediately to determine whether it should be removed and replaced. Engineer anticipates that up to approx. 10% of the insulation may need to be replaced.
Posted Date
Jan 20, 2026
Due Date
Mar 3, 2026
Release: Jan 20, 2026
Park County School District 1
Close: Mar 3, 2026
Work of the project includes removing the existing membrane, the installation of a nominal 50-mil fibertite mechanically fastened single-ply membrane roofing system, a min. 1/4" thick cover board, Polyisocyanurate insulation to create grade, and the required attachments to furnish a 20-year warranty on an existing 20,000 SF roof. All existing Polyisocyanurate insulation is intended to be reused, but work will also include evaluating the existing Polyisocyanurate insulation to identify any areas where its condition may make it unsuitable for reuse. If any damaged, deteriorated, wet, or inadequate insulation is found, the engineer should be notified immediately to determine whether it should be removed and replaced. Engineer anticipates that up to approx. 10% of the insulation may need to be replaced.
AvailablePark County School District 1
Work of the project includes removing the existing membrane, the installation of a nominal 50-mil fibertite mechanically fastened single-ply membrane roofing system, a min. 1/4" thick cover board, Polyisocyanurate insulation to create grade, and the required attachments to furnish a 20-year warranty on an existing 50,000 SF roof. All existing Polyisocyanurate insulation is intended to be reused, but work will also include evaluating the existing Polyisocyanurate insulation to identify any areas where its condition may make it unsuitable for reuse. If any damaged, deteriorated, wet, or inadequate insulation is found, the engineer should be notified immediately to determine whether it should be removed and replaced. Engineer anticipates that up to approx. 10% of the insulation may need to be replaced.
Posted Date
Jan 20, 2026
Due Date
Mar 3, 2026
Release: Jan 20, 2026
Park County School District 1
Close: Mar 3, 2026
Work of the project includes removing the existing membrane, the installation of a nominal 50-mil fibertite mechanically fastened single-ply membrane roofing system, a min. 1/4" thick cover board, Polyisocyanurate insulation to create grade, and the required attachments to furnish a 20-year warranty on an existing 50,000 SF roof. All existing Polyisocyanurate insulation is intended to be reused, but work will also include evaluating the existing Polyisocyanurate insulation to identify any areas where its condition may make it unsuitable for reuse. If any damaged, deteriorated, wet, or inadequate insulation is found, the engineer should be notified immediately to determine whether it should be removed and replaced. Engineer anticipates that up to approx. 10% of the insulation may need to be replaced.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.