NE Pump Station Rehabilitation Project RFP
Aug 11, 2026
Closes
Sep 2, 2026
Project consists of rehabilitation of the existing NE Pump Station wet well, including replacement of pump guiderails, discharge piping and fittings, surface preparation of the interior wet well and valve vault concrete and patching / surface repair of the interior wet well and valve vault concrete. Associated work includes installation of a temporary bypass valve, temporary bypass pumping, testing, and restoration.
