Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lander County
Work includes mobilization, creating a swppp and managing the associated documentation and mass earthwork including excavation, embankment, grading, and site preparation, construction of subgrade and structural fill; furnishing and placing subballast, encasements of underground utilities with markers including water, sewer; utility trenching and backfill; removing some existing fencing and pole line and all incidental work necessary to prepare the site for future railroad track improvements.
Posted Date
Mar 24, 2026
Due Date
Apr 15, 2026
Release: Mar 24, 2026
Lander County
Close: Apr 15, 2026
Work includes mobilization, creating a swppp and managing the associated documentation and mass earthwork including excavation, embankment, grading, and site preparation, construction of subgrade and structural fill; furnishing and placing subballast, encasements of underground utilities with markers including water, sewer; utility trenching and backfill; removing some existing fencing and pole line and all incidental work necessary to prepare the site for future railroad track improvements.
AvailableLander County
The project consists of, but is not limited to, rehabilitate of Runway 1-19, the end connector taxiways, and a portion of Taxiway B as shown on the plans. Work tasks for rehabilitation include milling, preparation of existing aggregate base material, asphalt paving, and striping. This project also consists of realignment of a portion of Taxiway B. Work tasks for realignment include those listed on rehabilitation plus excavation, site grading, subbase & base placement, and relocation and installation of edge lighting system.
Posted Date
Apr 7, 2026
Due Date
May 12, 2026
Release: Apr 7, 2026
Lander County
Close: May 12, 2026
The project consists of, but is not limited to, rehabilitate of Runway 1-19, the end connector taxiways, and a portion of Taxiway B as shown on the plans. Work tasks for rehabilitation include milling, preparation of existing aggregate base material, asphalt paving, and striping. This project also consists of realignment of a portion of Taxiway B. Work tasks for realignment include those listed on rehabilitation plus excavation, site grading, subbase & base placement, and relocation and installation of edge lighting system.
AvailableLander County
The project consists of, but is not limited to, the construction of an 80' x 80' steel aircraft hangar building on a concrete foundation at the location shown in the plans. Works tasks for this project include, but are not limited to, site preparation, foundation construction, building erection, and installation of metal siding, insulation, hydraulic hangar door, lighting, electrical receptacles, and other associated building materials.
Posted Date
Apr 7, 2026
Due Date
May 5, 2026
Release: Apr 7, 2026
Lander County
Close: May 5, 2026
The project consists of, but is not limited to, the construction of an 80' x 80' steel aircraft hangar building on a concrete foundation at the location shown in the plans. Works tasks for this project include, but are not limited to, site preparation, foundation construction, building erection, and installation of metal siding, insulation, hydraulic hangar door, lighting, electrical receptacles, and other associated building materials.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Lander County
The meeting included discussions on various topics, including commissioner and staff reports on meetings, conferences, and seminars attended. A public comment session addressed non-agenda items. The consent agenda was reviewed, covering approvals for meeting agendas and minutes from previous sessions. The commission discussed and considered action on the payment of bills, specifically pulling certain checks for further review. They also discussed and considered proposals for engineering design services and plans for the Lander County Event Center, including phased approaches and budget considerations.
The Lander County Commissioners held a meeting to discuss various topics including commissioner reports, staff reports, and a consent agenda. They discussed a realignment in Austintown meeting, and a strategic rail plan. The commission also held a public hearing regarding the use of off-highway vehicles on county roads, and discussed appointments to the Advisory Planning Commission and the Lander County Conservation District.
The Lander County Commissioners held a meeting to discuss various topics including commissioners and staff reports on attended meetings, conferences, and seminars. They discussed weather modification presentation, challenges with material pricing affecting bids, and the transfer of land from Pershing County. The meeting also covered public comments on non-agenda items, a consent agenda, and the appointment of individuals to the Lander County Planning Commission and the Lander Economic Development Authority Board. Additionally, there was discussion regarding a resolution to sell real property and the termination of services for a project at the Austin Youth Center.
The meeting included reports from commissioners on various meetings and conferences attended, covering topics such as convention and tourism, Kingston Town Board updates, legislative conferences, and Central Nevada Rural Water discussions. Staff reports highlighted the Christmas alert program, community garden projects, and upcoming county Christmas party. The agenda included a public hearing on a zone change application for a manufactured home replacement and discussion on the fiscal year 2023-2024 audit report, which received an unmodified clean opinion with no findings.
The meeting included discussions and actions on various topics. These included reports on meetings, conferences, and seminars attended by commissioners and staff, addressing a close call incident on Highway 305, easement on the water line loop project, and the upcoming budget process. Public comments were heard. The commission also discussed and approved bylaws and procedures, and appointed members to various advisory boards.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Lander County's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database