Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Forest County
Sale by County of County-Owned real estate.
Posted Date
Mar 19, 2026
Due Date
Apr 2, 2026
Release: Mar 19, 2026
Forest County
Close: Apr 2, 2026
Sale by County of County-Owned real estate.
AvailableForest County
The scope of the work includes minor selective demolition of existing walls, ceilings and doors. New work includes the construction of new steel stud walls that area finished with drywall. New suspended ceilings will be installed along with the patching of existing LVT plank flooring and vinyl base. New laminate work surfaces will be installed supported by steel angle brackets. A new reception area will include laminate wall cladding and countertop work surfaces. Edges of all counters will have 3 mm pvc edging. Some existing power and data outlets will be relocated, and additional power and data outlets will be added. Some existing ceiling light fixtures will be relocated, and new fixtures will be added. Existing HVAC ductwork, louvers and diffusers will be relocated as well as new HVAC ductwork, louvers and diffusers will be added. New solid core doors and hardware will be added to match existing. All electrical power and lighting layouts will be provided. The design of the power and lighting will be provided by the electrical contractor and must meet all codes. Inspections and fees required for power or lighting are to be arranged and paid by the electrical contractor. The design of the HVAC ductwork and distribution and final air balancing is to be provided by the HVAC contractor.
Posted Date
Mar 19, 2026
Due Date
Apr 7, 2026
Release: Mar 19, 2026
Forest County
Close: Apr 7, 2026
The scope of the work includes minor selective demolition of existing walls, ceilings and doors. New work includes the construction of new steel stud walls that area finished with drywall. New suspended ceilings will be installed along with the patching of existing LVT plank flooring and vinyl base. New laminate work surfaces will be installed supported by steel angle brackets. A new reception area will include laminate wall cladding and countertop work surfaces. Edges of all counters will have 3 mm pvc edging. Some existing power and data outlets will be relocated, and additional power and data outlets will be added. Some existing ceiling light fixtures will be relocated, and new fixtures will be added. Existing HVAC ductwork, louvers and diffusers will be relocated as well as new HVAC ductwork, louvers and diffusers will be added. New solid core doors and hardware will be added to match existing. All electrical power and lighting layouts will be provided. The design of the power and lighting will be provided by the electrical contractor and must meet all codes. Inspections and fees required for power or lighting are to be arranged and paid by the electrical contractor. The design of the HVAC ductwork and distribution and final air balancing is to be provided by the HVAC contractor.
AvailableForest County
Provide and install a whole building generator system for the Center. The goal of this project is to ensure uninterrupted electrical service to the entire facility in the event of a power outage. The selected contractor shall provide all labor, materials, and services necessary for the design, supply, installation, and commissioning of a reliable generator system capable of powering the entire building. Scope includes Site Assessment and Load Analysis Determination of the best location of the generator to meet all code requirements. System Design and Sizing Recommendation, Generator Set and ATS Supply (Automatic Transfer Switch), Fuel System to be natural gas. Contractor to connect to Owners existing service. Composite Pad and Mounting, Electrical Installation & Integration with Building Panel, Permit Acquisition and Code Compliance, Testing, Start-up, and Commissioning, User Training and Documentation.
Posted Date
Aug 14, 2025
Due Date
Sep 8, 2025
Release: Aug 14, 2025
Forest County
Close: Sep 8, 2025
Provide and install a whole building generator system for the Center. The goal of this project is to ensure uninterrupted electrical service to the entire facility in the event of a power outage. The selected contractor shall provide all labor, materials, and services necessary for the design, supply, installation, and commissioning of a reliable generator system capable of powering the entire building. Scope includes Site Assessment and Load Analysis Determination of the best location of the generator to meet all code requirements. System Design and Sizing Recommendation, Generator Set and ATS Supply (Automatic Transfer Switch), Fuel System to be natural gas. Contractor to connect to Owners existing service. Composite Pad and Mounting, Electrical Installation & Integration with Building Panel, Permit Acquisition and Code Compliance, Testing, Start-up, and Commissioning, User Training and Documentation.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
Forest County
Purchase order for a dual-sided ID badge printer, full-color ribbon, blank PVC cards, remote installation with support, and print control license for Forest County Emergency Management.
Effective Date
Sep 5, 2023
Expires
Effective: Sep 5, 2023
Forest County
Expires:
Purchase order for a dual-sided ID badge printer, full-color ribbon, blank PVC cards, remote installation with support, and print control license for Forest County Emergency Management.
AvailableForest County
Purchase order for Microsoft software licenses, including MS EA 0365 E1 GCC P User, MS EA INTUNE DVC GCC, MS EA AUDIO CONF GCC SELECT SUB ADD, and MS EA 0365 G1 PER USER F/SA, for Forest County Clerk. The total amount is $5424.48.
Effective Date
May 12, 2023
Expires
Effective: May 12, 2023
Forest County
Expires:
Purchase order for Microsoft software licenses, including MS EA 0365 E1 GCC P User, MS EA INTUNE DVC GCC, MS EA AUDIO CONF GCC SELECT SUB ADD, and MS EA 0365 G1 PER USER F/SA, for Forest County Clerk. The total amount is $5424.48.
Forest County
Purchase order for Forest County Emergency Management for the acquisition of LIFEPAK CR2 defibrillators and related accessories from American AED, totaling $4399.95.
Effective Date
Aug 3, 2023
Expires
Effective: Aug 3, 2023
Forest County
Expires:
Purchase order for Forest County Emergency Management for the acquisition of LIFEPAK CR2 defibrillators and related accessories from American AED, totaling $4399.95.
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Forest County
The Forest County public hearing on the proposed budget for the year 2025 includes discussion of expenditures for general government, public safety, health and human services, culture and recreation, conservation and development, public works, debt service, and transportation. Anticipated revenues and the proposed levy are also key discussion points.
This document details the Feasibility Study and Implementation Plan for Forest County to establish its own Human Service Department (HSD). The plan's purpose is to transition from a multi-county human service agreement to a single-county HSD, integrating existing social services and community programs. Key focus areas include improving access to and coordination of services, enhancing fiscal and programmatic accountability, and realizing efficiencies by combining agencies. The implementation involves developing purchase of service contracts, integrating aging and disability services, establishing a new governance board, and hiring an HSD Director. The intended outcome is an accessible, responsive, effective, efficient, and accountable social and human service delivery system for county residents, with an operational effective date of January 1, 2025.
This Aging Plan for Forest County, covering fiscal years 2025-2027, serves as a strategic framework to enhance the well-being, dignity, and independence of its aging population by aligning with the Older Americans Act. Key strategic goals include increasing advocacy for elderly and disabled transportation, maintaining person-centered and sustainable nutrition programs, expanding evidence-based health promotion activities such as StrongBodies and Bingocize, and strengthening caregiver support through recruitment, training, and equitable access to respite care services. The plan also prioritizes robust community engagement, integration of the aging unit with the ADRC of the Northwoods, enhanced coordination with Native American tribes, and comprehensive emergency preparedness to ensure accessible, inclusive, and effective services for all older adults in the community.
The committee meeting included updates on Title III projects, WPS radio repairs, EMPG grant funding, and the Hazmat grant. Travel requests for the WEMA Conference and Debris Management Training were approved. The committee reviewed the budget sheets for 2026, including Hazardous Materials, All Hazard Mitigation, SARA LEPC, 911, and Emergency Management. There was discussion regarding the miscellaneous line item in the Emergency Management budget. The Wabeno School Exercise was reviewed positively. The committee also discussed the PSAP grant and dispatch sergeant updates, including the upcoming launch of Total Response, dispatcher resignations, and the use of Rapid SOS and What III words. The monthly budget reports were shared, and future agenda items were discussed.
The meeting included discussions and actions on various topics, including job descriptions for the Human Services Director and Assistant Director, with the Assistant Director position put on hold for clarification. Training requests for employees were approved. The committee convened in a closed session to discuss possible litigation matters but took no action afterward. The board also discussed and acted on designating a responsible party to sign for the 5310 Mobility Management Grant and any other future grants awarded to the department. The Alvin meal site was discussed, with a motion to discontinue it as of 01/01/2026, pending GWAAR's approval. The purchase of four cellphones for the COA vans, funded by DOT and Mobility Management grants, was approved. An employee resignation was accepted. The process to communicate ADRC events was discussed, with a plan to provide a calendar and email updates. The director provided updates on fundraising efforts and grant funding.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Forest County's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
School Liaison Officer / DARE Instructor
County Clerk and Administrative Coordinator
Premium
Access the largest public sector contact database