County Route 7A Reconstruction and Rehabilitation RFP
Posted
Aug 13, 2026
Sep 27, 2026
Project consists of but not limited to Restore pavement to good condition using cost effective pavement treatments; Provide pedestrian and bicycle connectivity through continuous sidewalks, defined crossing locations, and standard shoulder widths; Improve, expand, and formalize the drainage system to reduce ponding and extend infrastructure longevity; Correct parking configurations to provide dedicated on-street parking; Reconfigure and modernize intersections to optimize the use of public right-of-way to better provide multimodal accommodations and serviceable green space.
