Pilkington Road At Sw Dawn Street Enhanced Crossing RFP
Aug 13, 2026
Closes
Sep 16, 2026
Work consists of 1 LS temporary workzone traffic control, complete; 280 LF stripe removal; 1 LS erosion control; 113 LF asphalt pavement sawcutting, less than 6"deep; 1 EA catch basin curb inlet, type wes standard gb-2; 28 LF concrete curbs, standard curb; 330 SF concrete walks; 40 SF signs, standard sheeting, extruded aluminum; 183 SF lawn seeding.