Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of University Place
The City of University Place is soliciting sealed bids for the construction of the Cirque Drive Overlay project, which involves providing an asphalt overlay on Cirque Drive between 67th Avenue W and S Orchard Street, adjusting utility structures, performing minor dig-out and pavement replacement, grinding pavement at curb lines to match existing gutters, and striping the roadway. The project is a federally aided project (Fed Aid #: STBGUL-3200(010)) with a 14% FSBE goal, with an estimated construction start date of July 15, 2026 and completion by August 27, 2026. Bid proposals must be accompanied by a 5% bid proposal deposit, and complete bid documents are available through ARC Document Solutions or Builders Exchange of Washington.
Posted Date
Jun 23, 2026
Due Date
Jul 16, 2026
Release: Jun 23, 2026
City of University Place
Close: Jul 16, 2026
The City of University Place is soliciting sealed bids for the construction of the Cirque Drive Overlay project, which involves providing an asphalt overlay on Cirque Drive between 67th Avenue W and S Orchard Street, adjusting utility structures, performing minor dig-out and pavement replacement, grinding pavement at curb lines to match existing gutters, and striping the roadway. The project is a federally aided project (Fed Aid #: STBGUL-3200(010)) with a 14% FSBE goal, with an estimated construction start date of July 15, 2026 and completion by August 27, 2026. Bid proposals must be accompanied by a 5% bid proposal deposit, and complete bid documents are available through ARC Document Solutions or Builders Exchange of Washington.
AvailableCity of University Place
The City of University Place is soliciting sealed bids for the construction of the Cirque Drive Overlay project, which involves providing an asphalt overlay on Cirque Drive between 67th Avenue W and S Orchard Street, adjusting utility structures, performing minor dig-out and pavement replacement, grinding pavement at curb lines to match existing gutters, and striping the roadway. The project is a federally aided project (Fed Aid #: STBGUL-3200(010)) with a 14% FSBE goal, with an estimated construction start date of July 15, 2026 and completion by August 27, 2026. Bid proposals must be accompanied by a 5% bid proposal deposit, and complete bid documents are available through ARC Document Solutions or Builders Exchange of Washington.
Posted Date
Jun 23, 2026
Due Date
Jul 16, 2026
Release: Jun 23, 2026
City of University Place
Close: Jul 16, 2026
The City of University Place is soliciting sealed bids for the construction of the Cirque Drive Overlay project, which involves providing an asphalt overlay on Cirque Drive between 67th Avenue W and S Orchard Street, adjusting utility structures, performing minor dig-out and pavement replacement, grinding pavement at curb lines to match existing gutters, and striping the roadway. The project is a federally aided project (Fed Aid #: STBGUL-3200(010)) with a 14% FSBE goal, with an estimated construction start date of July 15, 2026 and completion by August 27, 2026. Bid proposals must be accompanied by a 5% bid proposal deposit, and complete bid documents are available through ARC Document Solutions or Builders Exchange of Washington.
AvailableCity of University Place
Provide on-call material testing for subgrade, concrete, and asphalt. Work includes: Provide asphalt overlay on Cirque Drive between 67th Avenue West and South Orchard Street; update ADA facilities as required; adjust utility structures as needed; perform a minor amount of dig-out and minor pavement replacement; grind existing pavement at curb lines to match existing gutters; and stripe roadway.
Posted Date
May 5, 2026
Due Date
May 27, 2026
Release: May 5, 2026
City of University Place
Close: May 27, 2026
Provide on-call material testing for subgrade, concrete, and asphalt. Work includes: Provide asphalt overlay on Cirque Drive between 67th Avenue West and South Orchard Street; update ADA facilities as required; adjust utility structures as needed; perform a minor amount of dig-out and minor pavement replacement; grind existing pavement at curb lines to match existing gutters; and stripe roadway.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; steer to coops or competitive bidding instead.
Coops: Lead with a cooperative purchase (e.g., Sourcewell or eligible interlocal/piggyback).
City of University Place (WA) shows rigid adherence to competitive processes, with no evidence of sole source awards. No sole source dollar thresholds are cited.
Board meetings and strategic plans from City of University Place
The meeting featured proclamations for Duck Daze and Pride Month, alongside employee recognition. The consent agenda included the purchase of asphalt paving equipment and the designation of an applicant agent for FEMA grant administration. City Council members provided updates on their recent activities, including attendance at conferences, community celebrations, and regional partnerships. A study session was held regarding the Town Center Business District Subarea Plan and the required updates for the Parks, Recreation, and Open Space Plan to maintain eligibility for state grants.
The Council meeting agenda includes various presentations such as the Willits Canoe Donor Recognition, a Juneteenth Proclamation, and an Independence Day Proclamation. The consent agenda involves the adoption of a resolution to appoint voting delegates for the Association of Washington Cities' Annual Business Meeting. Additional items for consideration include the Town Center Business District Subarea Plan, a 2026 First Quarter Financial Report, and general updates from the City Manager and Council members.
The Park Advisory Commission held a meeting to discuss relevant agenda items regarding city park services and planning.
The City Council authorized the City Manager to purchase four sanitary sewer vaults from Oldcastle Infrastructure and awarded the Public Works Equipment Building Foundation project to Dallum Build Company.
This document details the City of University Place's Stormwater Management Program (SWMP), designed to comply with the Phase II NPDES permit during the 2024-2029 permit cycle. The program outlines comprehensive strategies to reduce stormwater pollutants and protect water quality through key components such as stormwater planning, public education and involvement, detailed mapping and illicit discharge detection, stringent controls for new and existing development runoff, source control, municipal operations and maintenance, and robust monitoring and reporting. The plan aims to foster sustainable stormwater practices and ensure environmental compliance within the city.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of University Place's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge