Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Sulphur
Construction of well field barbed-wire fence. 3" iron pipe welded stretch & corner posts, set in concrete, with kickers, all painted (NRCS Design); One (1)- 16-foot-wide metal, painted gate (supported by metal pipe reinforced ends, set in concrete, painted); Metal T-posts on 10-foot centers; Water gap; Six (6)-wire, 2 prong barbed wire.
Posted Date
Jul 16, 2026
Due Date
Aug 7, 2026
Release: Jul 16, 2026
City of Sulphur
Close: Aug 7, 2026
Construction of well field barbed-wire fence. 3" iron pipe welded stretch & corner posts, set in concrete, with kickers, all painted (NRCS Design); One (1)- 16-foot-wide metal, painted gate (supported by metal pipe reinforced ends, set in concrete, painted); Metal T-posts on 10-foot centers; Water gap; Six (6)-wire, 2 prong barbed wire.
AvailableCity of Sulphur
City hall HVAC system project.
Posted Date
Jul 16, 2026
Due Date
Aug 7, 2026
Release: Jul 16, 2026
City of Sulphur
Close: Aug 7, 2026
City hall HVAC system project.
AvailableCity of Sulphur
Street reconstruction work includes full reconstruction of street - approx. 500 LF. Work generally includes removals, earthwork, storm sewer improvements, sanitary sewer improvements, water line improvements, asphalt paving, aggregate base, stabilized subgrade, concrete curb and gutter, concrete commercial drives, traffic striping, pavement markings, and related appurtenances. Major items (not all items) include approx. Removals & Earthwork: 2,218 SY removal of existing asphalt, 6"; 52 LF remove existing curb & gutter; 1,627 CY unclassified excavation; Storm Sewer: 463 LF storm sewer pipe, including 18" RCP, 30" RCP, and 26" x 43" RC arch pipe; 1 EA 5 ft x 5 ft RC box culvert; 5 EA storm manholes and 3 EA curb inlets. Sanitary Sewer: 523 LF PVC SDR-35 sanitary sewer pipe. 4 EA sanitary manholes. Water: 677 LF C-900 PVC water line Paving: 44 TON 2" Superpave Type S4 asphalt; 488 TON 4" Superpave Type S3 asphalt; 619 CY Type A aggregate base; 2,727 SY stabilized subgrade; 282 SY 8" P.C. concrete commercial drive; 670 LF concrete curb & gutter; Striping & Markings:; 3,188 LF thermoplastic striping.
Posted Date
Jun 11, 2026
Due Date
Jul 6, 2026
Release: Jun 11, 2026
City of Sulphur
Close: Jul 6, 2026
Street reconstruction work includes full reconstruction of street - approx. 500 LF. Work generally includes removals, earthwork, storm sewer improvements, sanitary sewer improvements, water line improvements, asphalt paving, aggregate base, stabilized subgrade, concrete curb and gutter, concrete commercial drives, traffic striping, pavement markings, and related appurtenances. Major items (not all items) include approx. Removals & Earthwork: 2,218 SY removal of existing asphalt, 6"; 52 LF remove existing curb & gutter; 1,627 CY unclassified excavation; Storm Sewer: 463 LF storm sewer pipe, including 18" RCP, 30" RCP, and 26" x 43" RC arch pipe; 1 EA 5 ft x 5 ft RC box culvert; 5 EA storm manholes and 3 EA curb inlets. Sanitary Sewer: 523 LF PVC SDR-35 sanitary sewer pipe. 4 EA sanitary manholes. Water: 677 LF C-900 PVC water line Paving: 44 TON 2" Superpave Type S4 asphalt; 488 TON 4" Superpave Type S3 asphalt; 619 CY Type A aggregate base; 2,727 SY stabilized subgrade; 282 SY 8" P.C. concrete commercial drive; 670 LF concrete curb & gutter; Striping & Markings:; 3,188 LF thermoplastic striping.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Sole Source: Avoid sole source due to high compliance risk; for anything over $1,500, direct them to the city’s publicly posted competitive bid (Open Bids page).
Coops: Frequently procures through Sourcewell, OMNIA Partners, BuyBoard, and Oklahoma Purchasing System (TOPS); you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
City of Sulphur, OK: Avoid sole source due to high compliance risk. Redirect to the formal, publicly posted bidding process on the city’s Open Bids page to ensure a defensible transaction.
Board meetings and strategic plans from City of Sulphur
The board convened a series of sessions including a public hearing, a regular council meeting, and a trust meeting. Key discussions involved a special use permit for a residential business, updates on city recovery efforts following tornado damage, and status reports on downtown restoration and infrastructure projects. The council acted on appointing a new Municipal Judge, awarding construction contracts for fire department equipment and facilities, and approving pavement rehabilitation engineering. Additionally, the trust meeting addressed financial oversight and the potential outsourcing of city sanitation services.
The council discussed various operational updates, including tax collections, fuel sales, and ongoing municipal projects such as traffic light repairs, the Airport SPCC plan, and the City Museum stabilization. Significant focus was placed on the status of downtown infrastructure repairs, disaster recovery funding grants for the museum and historic district, and challenges related to the Street Paving Project change orders. Additionally, the board approved an updated personnel policy, authorized a resolution to propose a charter amendment regarding competitive bidding thresholds, appointed a new member to the Planning and Zoning Commission, and approved a contract for the Airport Runway Rehabilitation Crack Seal Project. The Sulphur Municipal Authority Trust also convened to discuss water quality test results for a new well project.
The board reviewed several infrastructure and recovery projects across multiple sessions. Key topics included street paving design, drainage specifications, and the rebidding process for specific road work. Additionally, the municipal authority addressed a rebid for a water well mains project and a permit renewal request for the Oklahoma Water Resources Board. The council also received updates on economic recovery initiatives, including federal grant applications for roadway, sidewalk, and water infrastructure development, as well as administrative reports on tax collections, airport fuel sales, and building maintenance.
The meetings covered various administrative and operational updates, including tax collections, airport fuel sales, and pending bids for a generator and fire department substation. Significant discussion occurred regarding the BUILD Transportation and Infrastructure Grant, downtown restoration efforts, and community improvement projects like fitness courts. Financial reviews addressed concerns over decreased sales tax revenue and inflation impact. The Council and Authority also approved various purchase orders, budget amendments, engineering task orders for street reconstruction and airport projects, and the purchase of a brush truck for the fire department. Updates on OWRB/Chickasaw Nation water well projects and debris consultant services were also provided.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Sulphur's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge