Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Othello
The proposed work included in this contract generally includes the following: Phase 1 - Removal of old concrete, and disposal of concrete, phase 2 - Construction of an approx. 1,824 SF single story slab on grade office building turn key ready according to blue prints, Furnish and install two 1,500 gallon traffic-rated septic pump chambers with appropriate PVC piping, electrical and alarm systems, Electrical power, lighting, heating and ventilation including any NREC consultation reviews and inspections as required, Network cabling as required by Othello Fair, Site work including site clearing; earthwork including earth fill, compaction, finish grading, Concrete work including all sidewalks connections and a 4 ft sidewalk around the entire perimeter of the building, phase 3 - Clean up, attaching gates and fencing, covering vaults with sod if necessary.
Posted Date
Mar 19, 2026
Due Date
Mar 27, 2026
Release: Mar 19, 2026
City of Othello
Close: Mar 27, 2026
The proposed work included in this contract generally includes the following: Phase 1 - Removal of old concrete, and disposal of concrete, phase 2 - Construction of an approx. 1,824 SF single story slab on grade office building turn key ready according to blue prints, Furnish and install two 1,500 gallon traffic-rated septic pump chambers with appropriate PVC piping, electrical and alarm systems, Electrical power, lighting, heating and ventilation including any NREC consultation reviews and inspections as required, Network cabling as required by Othello Fair, Site work including site clearing; earthwork including earth fill, compaction, finish grading, Concrete work including all sidewalks connections and a 4 ft sidewalk around the entire perimeter of the building, phase 3 - Clean up, attaching gates and fencing, covering vaults with sod if necessary.
City of Othello
Provide 20 duty pistols equivalent or superior to Glock 17 Gen 6 and 20 red dot pistol optics equivalent or superior to the Trijicon RMR type 2.
Posted Date
Jan 29, 2026
Due Date
Feb 28, 2026
Release: Jan 29, 2026
City of Othello
Close: Feb 28, 2026
Provide 20 duty pistols equivalent or superior to Glock 17 Gen 6 and 20 red dot pistol optics equivalent or superior to the Trijicon RMR type 2.
City of Othello
Construction of a new 200,000-gallon multi-column elevated steel tank and site improvements; new CMU wellhouse building, approx., 6,000 LF of water main, a gravel access road, HMA road restoration, and electrical/telemetry upgrades.
Posted Date
Aug 19, 2025
Due Date
Sep 9, 2025
Release: Aug 19, 2025
City of Othello
Close: Sep 9, 2025
Construction of a new 200,000-gallon multi-column elevated steel tank and site improvements; new CMU wellhouse building, approx., 6,000 LF of water main, a gravel access road, HMA road restoration, and electrical/telemetry upgrades.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Only applicable for declared emergencies; otherwise skip.
Coops: Ask to purchase via Washington DES or an approved Benton County–linked cooperative. If available, proceed and bypass a formal bid.
City of Othello: No evidence of sole source awards outside declared emergencies. Deprioritize this route and pivot to a cooperative purchase.
Board meetings and strategic plans from City of Othello
The council discussed and approved an amendment to the Varela & Associates Engineering Agreement for the CERB Grant to obtain a $50,000 Washington State Community and Economic Revitalization Board (CERB) Grant. The grant aims to take the first step in locating industrial treatment facilities in Othello, including evaluating discharge and treatment alternatives and preparing a Preliminary Engineering Report. The council also approved a resolution for a $41K match to the CERB Grant, confirming that the city has budgeted the necessary funds.
The City of Othello's Parks & Recreation Element outlines a strategic direction for its parks and recreation facilities from 2022 to 2027. The plan focuses on eight key goals: investing in growth opportunities, ensuring unique amenities, improving amenity distribution, maintaining sufficient open space, prioritizing future needs, fostering partnerships, maximizing safety, and enhancing accessibility. Key initiatives include developing new facilities such as a soccer complex, eco park, farmers market, splash pad, and indoor sports facilities, alongside the renovation and maintenance of existing parks to meet community demand and improve the quality of life for residents and visitors.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Othello's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database