Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Long Beach's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Treasurer
City Administrator
Streets/Parks/Drainage Supervisor
Building Inspector
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Long Beach
VISN 22 (Desert Pacific Healthcare Network) issued a Sources Sought/RFI (36C26226Q0253) seeking Philips IntelliVue patient monitoring systems plus installation and configuration services for the Long Beach VA Healthcare System. The procurement lists specific line items and quantities (e.g., 125 IntelliVue Multi-Measurement Module X3 units and associated supplies and services) and requests market responses to the RFI by January 21, 2026. This is a federal RFI (not a grant) posted on SAM.gov and appears open/active as of 2026-01-08.
Posted Date
Jan 7, 2026
Due Date
Jan 21, 2026
Release: Jan 7, 2026
City of Long Beach
Close: Jan 21, 2026
VISN 22 (Desert Pacific Healthcare Network) issued a Sources Sought/RFI (36C26226Q0253) seeking Philips IntelliVue patient monitoring systems plus installation and configuration services for the Long Beach VA Healthcare System. The procurement lists specific line items and quantities (e.g., 125 IntelliVue Multi-Measurement Module X3 units and associated supplies and services) and requests market responses to the RFI by January 21, 2026. This is a federal RFI (not a grant) posted on SAM.gov and appears open/active as of 2026-01-08.
AvailableCity of Long Beach
Work consists of 1 LS Mobilization and Demobilization; 1 LS Lift Station 2 Improvements; 1 LS Lift Station 5 Improvements; 1 LS Breakers Lift Station Improvements; 10 CY Unsuitable Excavation; 1 LS Lift Station 2 Bypass Pumping; 1 LS Lift Station 5 Bypass Pumping; 1 LS Breakers Lift Station Bypass Pumping; 1 LS Lift Station 2 Electrical; 1 LS Lift Station 5 Electrical; 1 LS Breakers Lift Station Electrical.
Posted Date
Oct 22, 2025
Due Date
Nov 25, 2025
Release: Oct 22, 2025
City of Long Beach
Close: Nov 25, 2025
Work consists of 1 LS Mobilization and Demobilization; 1 LS Lift Station 2 Improvements; 1 LS Lift Station 5 Improvements; 1 LS Breakers Lift Station Improvements; 10 CY Unsuitable Excavation; 1 LS Lift Station 2 Bypass Pumping; 1 LS Lift Station 5 Bypass Pumping; 1 LS Breakers Lift Station Bypass Pumping; 1 LS Lift Station 2 Electrical; 1 LS Lift Station 5 Electrical; 1 LS Breakers Lift Station Electrical.
City of Long Beach
This project provides for five schedules of work: Schedule A1 includes work associated with installation of approx. 2,280 LF of new 12" diameter PVC water main for the replacement of existing 2" steel and 6" AC water main. The remaining schedules of work include work on Schedule A2 includes work associated with installation of approx. 1,240 LF of new 12" diameter PVC water main for the replacement of existing 6" PVC water main. Schedule B includes work associated with installation of approx. 810 LF of new 8" diameter PVC sanitary sewer. Schedule C includes work associated with installation of approx. 1,370 LF of 24" diameter and approx. 140 LF of 18" diameter CPEP stormwater pipe. Schedule D includes reconstruction of cement treated base, cement concrete curb and gutter, cement concrete sidewalk, asphalt paving, pavement markings and other related work items.
Posted Date
May 21, 2025
Due Date
Jun 12, 2025
Release: May 21, 2025
City of Long Beach
Close: Jun 12, 2025
This project provides for five schedules of work: Schedule A1 includes work associated with installation of approx. 2,280 LF of new 12" diameter PVC water main for the replacement of existing 2" steel and 6" AC water main. The remaining schedules of work include work on Schedule A2 includes work associated with installation of approx. 1,240 LF of new 12" diameter PVC water main for the replacement of existing 6" PVC water main. Schedule B includes work associated with installation of approx. 810 LF of new 8" diameter PVC sanitary sewer. Schedule C includes work associated with installation of approx. 1,370 LF of 24" diameter and approx. 140 LF of 18" diameter CPEP stormwater pipe. Schedule D includes reconstruction of cement treated base, cement concrete curb and gutter, cement concrete sidewalk, asphalt paving, pavement markings and other related work items.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.