Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Indian Harbour Beach
The services to be performed include mowing, trimming, edging, herbicide application and other maintenance as needed to provide attractive Walkways and Traffic Islands.
Posted Date
Jun 17, 2026
Due Date
Aug 7, 2026
Release: Jun 17, 2026
City of Indian Harbour Beach
Close: Aug 7, 2026
The services to be performed include mowing, trimming, edging, herbicide application and other maintenance as needed to provide attractive Walkways and Traffic Islands.
AvailableCity of Indian Harbour Beach
The City of Indian Harbour Beach (FL) issued RFQ 2026-01 seeking continuing professional engineering and stormwater consulting services to support land development, planning engineering, and stormwater program needs. The solicitation is an RFQ (Request for Qualifications), open for submissions from 2026-06-11 through 2026-07-24 with a public bid opening scheduled for 2026-07-27. Related documents and attachments are listed on the city's bid posting; no direct primary file URL was found on the public page.
Posted Date
Jun 11, 2026
Due Date
Jul 24, 2026
Release: Jun 11, 2026
City of Indian Harbour Beach
Close: Jul 24, 2026
The City of Indian Harbour Beach (FL) issued RFQ 2026-01 seeking continuing professional engineering and stormwater consulting services to support land development, planning engineering, and stormwater program needs. The solicitation is an RFQ (Request for Qualifications), open for submissions from 2026-06-11 through 2026-07-24 with a public bid opening scheduled for 2026-07-27. Related documents and attachments are listed on the city's bid posting; no direct primary file URL was found on the public page.
City of Indian Harbour Beach
Work to include: add a partition wall, stopping at the ceiling grid, leaving one full window for each space; close in the existing door opening; add two new door openings with doors; move the existing light switch and add a light switch.
Posted Date
Oct 9, 2025
Due Date
Nov 14, 2025
Release: Oct 9, 2025
City of Indian Harbour Beach
Close: Nov 14, 2025
Work to include: add a partition wall, stopping at the ceiling grid, leaving one full window for each space; close in the existing door opening; add two new door openings with doors; move the existing light switch and add a light switch.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $40,000, still deprioritize; steer back to coops.
Coops: Frequently procures through Sourcewell and Texas DIR; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
City of Indian Harbour Beach (FL): No evidence of sole source awards in public records—treat as a non-viable path. No known sole source dollar threshold identified. High barrier (95/100 friction score).
Board meetings and strategic plans from City of Indian Harbour Beach
The council discussed and authorized the direction for the future Muck Removal project. The approved strategy involves prioritizing dredging work on finger canals before addressing the grand canal, while simultaneously seeking additional funding and grants. Furthermore, the council approved the pursuit of a Memorandum of Understanding with the City of Satellite Beach regarding administrative tasks and authorized the initiation of piggyback contracts with Gator Dredging and Atkins Realis.
The workshop focused on the review of the preliminary fiscal years 2027-2031 financial model and capital improvement plan. Key outcomes included reaching a consensus to implement a 3.25% increase, comprised of a 0.25% cost of living adjustment and a 3% step progression, for the proposed budget. Additionally, the council agreed to include funding for a consultant to perform a feasibility study regarding a potential non-ad valorem fire service assessment fee.
The council discussed updates to the noise ordinance, specifically regarding decibel levels for amplified music in residential districts and loading/unloading activities. Additionally, the meeting included approval of a new franchise agreement and deliberations on renewing health, dental, and vision insurance plans for city employees, including decisions on premium cost-sharing structures.
The City Council conducted a workshop to discuss the potential implementation of a paid beach parking system. Residents voiced widespread concerns regarding the current inability to access local beaches due to overcrowding, particularly by non-residents, users of short-term vacation rentals, and individuals who leave vehicles in spaces for extended periods. Key discussion points included the necessity of a resident parking permit program to prioritize local access, strategies to manage issues such as litter and vandalism, and the potential for parking revenue to support beach maintenance and law enforcement. There was general consensus among the public speakers that a structured parking system is needed to restore local access and improve beach management.
The council discussed the potential adoption of a local ordinance to regulate low-speed vehicles and golf carts. Key topics included legal guidance on municipal authority under state statutes, the limitations imposed by Attorney General opinions, and liability concerns for the city. Discussions also covered mandatory equipment requirements, potential restrictions for unlicensed drivers, and the necessity of conducting a traffic study to determine road safety and usage, which was estimated to cost approximately $19,500. Additionally, the council considered coordinating regulatory efforts with neighboring municipalities.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Indian Harbour Beach's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge