Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Helena
This solicitation requests construction and improvement work at Deer Lodge City-County Airport including new taxiways, apron expansion, runway grading, and electrical improvements. The project is divided into multiple schedules covering drainage, utility relocations, demolition of structures, and AWOS installation. Contractors are required to provide all necessary labor, equipment, and materials to complete the specified airport infrastructure upgrades.
Posted Date
Feb 16, 2026
Due Date
Mar 18, 2026
Release: Feb 16, 2026
City of Helena
Close: Mar 18, 2026
This solicitation requests construction and improvement work at Deer Lodge City-County Airport including new taxiways, apron expansion, runway grading, and electrical improvements. The project is divided into multiple schedules covering drainage, utility relocations, demolition of structures, and AWOS installation. Contractors are required to provide all necessary labor, equipment, and materials to complete the specified airport infrastructure upgrades.
AvailableCity of Helena
Work includes approx. 930 LF of combined concrete curb and gutter; 850 SY of seeding; 775 SF of concrete sidewalk (4"); 284 SF of concrete valley gutter; 582 SF of concrete driveway apron (6"); 174 SY of asphalt pavement removal; 1 LS mobilization; 1 LS taxes, bonds & insurance; 1 LS general requirements; 1 EA special curb inlet; 1 LS construction traffic control; 53 SY concrete removal; 191 SY asphalt pavement removal; 2 EA existing street sign to be relocated. See outside link.
Posted Date
Feb 3, 2026
Due Date
Feb 19, 2026
Release: Feb 3, 2026
City of Helena
Close: Feb 19, 2026
Work includes approx. 930 LF of combined concrete curb and gutter; 850 SY of seeding; 775 SF of concrete sidewalk (4"); 284 SF of concrete valley gutter; 582 SF of concrete driveway apron (6"); 174 SY of asphalt pavement removal; 1 LS mobilization; 1 LS taxes, bonds & insurance; 1 LS general requirements; 1 EA special curb inlet; 1 LS construction traffic control; 53 SY concrete removal; 191 SY asphalt pavement removal; 2 EA existing street sign to be relocated. See outside link.
City of Helena
The City of Helena is soliciting bids for the North 27th Ave Improvements project, which includes construction of a new roundabout, sidewalk, curb, gutter, and asphalt paving. The scope also covers extensive utility work such as storm drainage, domestic water, sanitary sewer systems, and roadway lighting. This single construction contract has an estimated value range between $5,000,000 and $15,000,000.
Posted Date
Feb 2, 2026
Due Date
Mar 4, 2026
Release: Feb 2, 2026
City of Helena
Close: Mar 4, 2026
The City of Helena is soliciting bids for the North 27th Ave Improvements project, which includes construction of a new roundabout, sidewalk, curb, gutter, and asphalt paving. The scope also covers extensive utility work such as storm drainage, domestic water, sanitary sewer systems, and roadway lighting. This single construction contract has an estimated value range between $5,000,000 and $15,000,000.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $20,000, use sole source.
Coops: Use Sourcewell or BuyBoard to buy now and avoid the $20,000 bid/RFP trigger.
Entity: City of Helena (MT)
Threshold context: Purchases at/over $20,000 trigger formal competition; there is no evidence of sole source awards above this level.
Board meetings and strategic plans from City of Helena
This document outlines the City of Helena's Storm Water Management Program (SWMP), which is designed to ensure compliance with the Montana Department of Environmental Quality's General Permit for Small Municipal Separate Storm Sewer Systems (MS4s). The program focuses on reducing the discharge of pollutants to the maximum extent practicable through the implementation of six minimum control measures: Public Education and Outreach, Public Involvement and Participation, Illicit Discharge Detection and Elimination, Construction Site Storm Water Management, Post-Construction Site Storm Water Management, and Pollution Prevention/Good Housekeeping. It also includes provisions for training, monitoring, recording, and evaluation to protect water quality.
This document outlines the 2025 WWTP Facility Plan, focusing on approximately $40M in needed improvements to secondary treatment and solids handling facilities. The plan details a phased approach to balance future rate increases and available infrastructure funding. Key components include a reduced Phase 2 scope costing $23.5M for oxidation ditches, clarifiers, and UV disinfection, with Phases 3 and 4 contingent on future growth and funding. Funding strategies involve a $21.6M State Revolving Fund loan and applications for $2.5M in grants, with an estimated $60 rate increase spread over three years to generate $1.34M annually for debt service and operations.
The agenda for this meeting included public comment periods, review of unfinished business such as priority items for the March Commission Presentation concerning the Art Walk and Fire Safety Open House, and discussions regarding Boulevard Trees and the Garden Tour. New business involved considering priority items for the March Commission Presentation related to Neighborhood Parties. The committee also addressed proposals and scheduling for the next agenda.
This document outlines proposed major projects for the City of Helena Open Lands Division for Calendar Year 2026. It defines criteria for major projects, focusing on trail construction, usage changes, removal/rerouting, significant public interest, and substantial costs. The plan details recommendations for Deford Trail Improvements, Oakes Street Park Trail Relocation, Nob Hill Park Trail System Improvements, and North Benton Trail Improvements, providing current situations, specific recommendations, and estimated budgets for each.
Key discussions during the meeting included the consideration of new appointees, Dean Barta and Richard Sloan, followed by officer reports from the Chair, Vice Chair, and Treasurer, focusing on community input into the City Budget and Budget Committee discussions. Unfinished business involved consideration of updates to the HCC Bylaws regarding the regular meeting time and other revisions, including a review of survey results. New business focused on considering a minor expenditure for Art Walk Registration, determining HCC Priorities for the upcoming FY27 City Budget Development, and considering a Draft Recommendation to the Commission concerning City of Helena Policy when Federal Immigration Enforcement Actions are present within City Limits. Reports were also presented regarding various Commission/Board meetings.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Helena's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database