Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Chelan
Provide professional airport planning and environmental services for the following projects at the Lake Chelan Airport/S10: Review and update the 2021 Lake Chelan Airport Master plan; conduct overview of environmental conditions and advise regarding additional required analysis, if any; develop and implement a robust public involvement and stakeholder engagement plan; prepare draft and final documents; develop project-specific schedules; and other federal or nonfederal funded airport projects consistent with the ALP.
Posted Date
Jun 15, 2026
Due Date
Jul 10, 2026
Release: Jun 15, 2026
City of Chelan
Close: Jul 10, 2026
Provide professional airport planning and environmental services for the following projects at the Lake Chelan Airport/S10: Review and update the 2021 Lake Chelan Airport Master plan; conduct overview of environmental conditions and advise regarding additional required analysis, if any; develop and implement a robust public involvement and stakeholder engagement plan; prepare draft and final documents; develop project-specific schedules; and other federal or nonfederal funded airport projects consistent with the ALP.
AvailableCity of Chelan
The project consists of the construction and modification of a public sewer lift station, including demolition of the existing CMU building and removal of all existing triplex lift station components. Work includes replacement of the gravity sewer, installation of a new precast valve vault, rehabilitation of the existing wet well, and installation of new duplex lift station equipment with associated electrical and control system upgrades. Additional improvements include installation of a new backup generator, construction of a new force main, water main installation, and storm drainage enhancements. Site work will include landscaping and general site improvements such as retaining walls, asphalt and concrete surfacing, stairs and handrails, fencing, irrigation, plantings, and other items necessary to complete the work included in the project.
Posted Date
Jun 18, 2026
Due Date
Jul 15, 2026
Release: Jun 18, 2026
City of Chelan
Close: Jul 15, 2026
The project consists of the construction and modification of a public sewer lift station, including demolition of the existing CMU building and removal of all existing triplex lift station components. Work includes replacement of the gravity sewer, installation of a new precast valve vault, rehabilitation of the existing wet well, and installation of new duplex lift station equipment with associated electrical and control system upgrades. Additional improvements include installation of a new backup generator, construction of a new force main, water main installation, and storm drainage enhancements. Site work will include landscaping and general site improvements such as retaining walls, asphalt and concrete surfacing, stairs and handrails, fencing, irrigation, plantings, and other items necessary to complete the work included in the project.
AvailableCity of Chelan
Provide professional traffic and street design, engineering, and consulting services including preliminary engineering and design of crosswalks, bulbouts, ADA ramps, and illumination for pedestrian safety along Sanders Street at intersections with Okanogan Avenue and Wapato Avenue. Services also include construction management, inspections, and environmental analysis.
Posted Date
-
Due Date
Mar 13, 2024
City of Chelan
Close: Mar 13, 2024
Provide professional traffic and street design, engineering, and consulting services including preliminary engineering and design of crosswalks, bulbouts, ADA ramps, and illumination for pedestrian safety along Sanders Street at intersections with Okanogan Avenue and Wapato Avenue. Services also include construction management, inspections, and environmental analysis.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; unlikely to be approved and will delay the purchase.
Coops: Lead with MRSC Rosters participation or piggyback via the City of Kirkland interlocal.
City: City of Chelan, WA.
Posture: Deprioritize — no evidence of sole source awards; process defaults to competitive methods.
Board meetings and strategic plans from City of Chelan
The City of Chelan's strategic direction, outlined in 'The Lake Line' Spring 2026 Edition, is built upon four guiding principles: Visionary & Strategic, Thriving & Connected, Healthy & Sustainable, and Accessible & Welcoming. This approach is implemented through a Comprehensive Plan, which serves as a 20-year blueprint currently undergoing an update, to align community priorities with infrastructure planning and fiscal responsibility. Key elements addressed include housing, climate resiliency, transportation, capital facilities, economic development, parks & recreation, land use, and utilities, with the overarching goal of ensuring an exceptional quality of life and long-term sustainability for the community.
The board reviewed and recommended changes to the municipal code regarding golf course operations for City Council approval. Members discussed and established their goals for the year, reviewed concessionaire requests for local parks, and identified a representative to participate in a stakeholder focus group for the Lake Chelan Golf Course Study. Additionally, the Parks and Recreation Director provided updates on upcoming security service proposals, the status of the Lakeside Park renovation project, and the tentative golf course opening schedule. The board also engaged in a discussion regarding potential interest in a property near the airport and the Columbia River.
The board received a presentation from Nordica Saunas regarding an electric sauna business concept for city parks. Staff provided updates on the Chelan Municipal Code 2.17 revision timeline and the status of the Lakeside Park renovation project. Planning for the upcoming summer season was discussed, covering security, staffing, signage, and communication. Furthermore, the board deliberated on a future policy regarding fee waivers for ball field and park facility use, including criteria for qualifying groups, and reviewed the condition of fields at Chelan Gorge Park alongside its recent site master plan.
The commission held a work session to discuss updating outdated sign regulations, focusing on lighting standards, sign consolidation, temporary signage, and maintaining small-town character while reducing sidewalk clutter. Additionally, administrative reports covered countywide housing affordability data, infrastructure progress, and the receipt of a $1.4M CHIP grant for sewer extension projects. Citizen comments addressed regional housing challenges and concerns regarding signage aesthetics, while commissioners requested information on potential legislative updates affecting local zoning.
This document outlines ten key accomplishments, reflecting progress in long-term financial stewardship, in-house project delivery capacity, community engagement, and multi-level collaboration. Key achievements include advancing critical water, sewer, airport, and transportation infrastructure, expanding housing options, and securing over $18 million in investments. Additionally, the document notes the launch of the 2026 Comprehensive Plan update.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Chelan's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge