Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Adrian
scope of work for furnishing, installing, starting up, testing, and placing into service a complete condensing hot-water boiler package for the Adrian WWTP Boiler Replacement project.
Posted Date
Jun 3, 2026
Due Date
Jun 25, 2026
Release: Jun 3, 2026
City of Adrian
Close: Jun 25, 2026
scope of work for furnishing, installing, starting up, testing, and placing into service a complete condensing hot-water boiler package for the Adrian WWTP Boiler Replacement project.
AvailableCity of Adrian
Provide liquid carbon dioxide to be used at the water treatment plant. All chemicals must meet NSF Standards 60 for application to potable water. Annual estimated requirement is 300,000 pounds.
Posted Date
May 28, 2022
Due Date
Jun 9, 2026
Release: May 28, 2022
City of Adrian
Close: Jun 9, 2026
Provide liquid carbon dioxide to be used at the water treatment plant. All chemicals must meet NSF Standards 60 for application to potable water. Annual estimated requirement is 300,000 pounds.
AvailableCity of Adrian
Project consists of the replacement of existing pumps and interior header pipe replacement at the pump station, as well as replacement of the existing dual 18-inch cast iron and transite sanitary sewer force main with a 20-inch hdpe sanitary force main. The force main consists of dual force mains of approx. 4,700-feet each and will be installed using horizontal directional drilling methods. Two (2) air relief valves and two (2) plug valves are included. The force main will cross two (2) reaches of the river raisin.
Posted Date
Jun 1, 2026
Due Date
Jun 23, 2026
Release: Jun 1, 2026
City of Adrian
Close: Jun 23, 2026
Project consists of the replacement of existing pumps and interior header pipe replacement at the pump station, as well as replacement of the existing dual 18-inch cast iron and transite sanitary sewer force main with a 20-inch hdpe sanitary force main. The force main consists of dual force mains of approx. 4,700-feet each and will be installed using horizontal directional drilling methods. Two (2) air relief valves and two (2) plug valves are included. The force main will cross two (2) reaches of the river raisin.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $10,000, use sole source.
Coops: Lead with MiDEAL or Sourcewell. Confirm your contract eligibility and align with procurement and the department head to avoid a formal bid.
Entity: City of Adrian, MI
Threshold context: Very low $10,000 competitive bidding threshold; sole source is viable only for highly specialized cases.
Board meetings and strategic plans from City of Adrian
The commission addressed several key topics including the appointment of a new Fire Chief, authorization to issue a Request for Qualifications for coordinated five-year strategic plans for both the city and the parks system, and the approval of a paving contract for the 2026 construction season. The commission held public hearings and established special assessment districts for street improvements on Cherry and Hunt Streets. Additional actions included authorizing an enhancement grant allocation for a downtown façade improvement program, supporting the installation of a new downtown clock, and reviewing project scopes for the downtown walk and bike loop and town square redevelopment. The subcommittee also provided updates regarding enhancement grant-funded projects.
The commission discussed topics including the search for a new City Administrator, the Community Development Director role, and proclamations regarding the Clark Memorial Hall restoration. The consent agenda included the renewal of commercial marihuana facility permits, various engineering and maintenance bids, the purchase of a dump truck for street maintenance, a lease agreement for the Piotter Center, promotional testing for the Fire Department, and replacement pumps for the Wastewater Treatment Plant. The regular agenda addressed environmental testing and soil remediation for the Winter Street Development Project, approval of a Mural Lease Agreement for a downtown installation, and an employment agreement for the Acting City Administrator.
The commission addressed several key agenda items, including the resignation of the city administrator and the status of his remaining term. Public comments were received regarding personnel concerns and the disposal of the Fee Estate property. Proclamations were issued for National Police Week and Peace Officers Memorial Day, as well as for Cinco de Mayo. A closed session was held to discuss a union contract. Additionally, a detailed report was provided on the environmental remediation and current status of the city-owned property at 411 South Main Street, known as the Fee Estate.
The meeting included the presentation of a proclamation for the restoration of Clark Memorial Hall. Key discussions focused on the search for a new city administrator, including reviewing the timeline for candidate interviews, potential second interviews, and updates regarding the status of previously vetted candidates. The commission deliberated on balancing the need for an expedited hiring process with the necessity of thorough due diligence.
The commission addressed several key topics, including the removal of a street sign and a closed session regarding an agreement with Lenawee Now. Proclamations were issued for Arbor Day and a state championship. The commission approved resolutions for financial matters, including the transfer of funds for a town square project, additional electrical work costs, and the adoption of the capital improvement program and capital budget. Additionally, the commission introduced ordinances regarding snow and ice removal and zoning amendments, and approved various contracts and rental rates for city facilities.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Adrian's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge