Courthouse Superior Court HVAC and Roof Insulation Repairs(Request for Proposal)
Posted
Sep 2, 2026
Sep 22, 2026
Work will consist of removal and replacement of existing HVAC equipment serving the superior courtroom. Work is as follows:; Remove existing “water source heat pumps (WSHPs)”WSHP on mechanical platform; Install new WSHPs on existing platform and connect to existing power, duct and water piping; Provide test and balance report; Replace existing plywood on attic platform; Contractor shall be responsible for cutting of existing sheet rock ceilings for installation of new work.
