Consulting services for topographic surveys, design plans and specifications, bid support, and optional construction management for pavement preservation and ADA ramp improvements on two City of Camas corridors.
Replace the building's mechanical equipment and plumbing fixtures that are at the end of their serviceable life with new equipment. Install a new source capture system and a new energy recovery ventilation system with distribution to new air handlers. Install a new building automation system. Electrical work consists of disconnection and reconnection of replaced mechanical equipment and upgrade to circuits and wiring as necessary. In addition to MEP-related work, perform specified demolition of existing half-height mezzanine wall within the fire station's apparatus bay to reconstruct the wall, providing a fully enclosed mezzanine space. There is an additive alternate for siding review and repairs.
Replace the building's mechanical equipment and plumbing fixtures that are at the end of their serviceable life with new equipment. Install a new source capture system and a new energy recovery ventilation system with distribution to new air handlers. Install a new building automation system. Electrical work consists of disconnection and reconnection of replaced mechanical equipment and upgrade to circuits and wiring as necessary. In addition to MEP-related work, perform specified demolition of existing half-height mezzanine wall within the fire station's apparatus bay to reconstruct the wall, providing a fully enclosed mezzanine space. There is an additive alternate for siding review and repairs.
Buyer Attributes
Key metrics and characteristics
Census ID
Government ID for mapping buyers across datasets.
184245
Employee FTE
Full-time equivalent employees.
264
Population
Population size to gauge opportunity scale.
27,749
Procurement Difficulty Score
How easy their procurement process is to navigate. Lower is better.
48 / 100
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
CautiousAggressive
Higher is better Unlock
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
ConservativeEarly Adopter
Higher is better Unlock
Startup Friendliness
How often this buyer champions startups and early adoption.
Sole Source:Deprioritize; pivot to coops/rosters immediately.
Coops:Frequently procures through Sourcewell and MRSC Rosters; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
Agency-specific vendor registration, compliance steps, and approval routing shape the purchasing timeline.
Unlock detailed thresholds, contracting paths, payment terms, and vendor benchmarks for this buyer.
City of Camas, WA:There is no documented pattern of sole source awards. Deprioritize this path and pivot to cooperative contracts and MRSC Rosters. No dollar thresholds were provided.
Agency-specific vendor registration, compliance steps, and approval routing shape the purchasing timeline.
Unlock detailed thresholds, contracting paths, payment terms, and vendor benchmarks for this buyer.
Full playbooks include agency-specific workflows, thresholds, and vendor benchmarks.
Early Buyer Signals
Board meetings and strategic plans from City of Camas
Parks and Recreation Commission Meeting Minutes
Date: Oct 28, 2026Type: Meeting mention
The meeting featured an update on the 2027-2028 budget, including potential program cuts. Discussion topics included the ongoing racquet sports survey, updates on special events such as the Pumpkin Party, Boo Bash, Zombie Dash, and Hometown Holidays, and the consideration of combining the November and December meetings. Additionally, the commission received progress reports on several projects, including the wildfire mitigation study, the Emerald Ash Borer project, the Clark County Parks and Natural Areas System Plan survey, and specific maintenance and improvement updates regarding Grass Valley Park, Dorothy Fox Park restrooms, and Klickitat Park.
City Of Camas Planning Commission Meeting Minutes
Date: Oct 20, 2026Type: Meeting mention
The Planning Commission discussed updates to several key municipal and district plans, including the Washougal & Evergreen School District Capital Facility Plans, the General Sewer Plan, the Water System Plan, and the Transportation System Plan. Staff members provided responses to commissioner inquiries regarding these plans. Additionally, an update was provided concerning the comprehensive plan and its adoption timeline.
City of Camas Hearings Examiner Hearings Examiner Meeting Minutes
Key Contacts
Public-sector contacts connected to City of Camas.
Who manages procurement contracts and purchasing for the City of Camas?
The City of Camas Public Works Department issues and manages Public Works solicitations, and the Public Works Director is listed as the contact. Vendors should use the contact and submission instructions provided in each posted solicitation PDF on the City of Camas website.
Where does the City of Camas post bids and RFPs?
The City of Camas posts bids and downloadable RFP/RFQ PDFs on its official website, primarily under Public Works project pages. Vendors should monitor the City of Camas Public Works project pages and solicitation attachments for posted opportunities and documents.
What vendor requirements does the City of Camas publish?
The City of Camas publishes solicitation-specific vendor requirements—insurance, bonding, required forms, and compliance terms—inside each posted RFP/RFQ PDF. Vendors must review each City of Camas solicitation PDF for exact submission instructions and required documentation.
Native sync to Salesforce & HubSpot
Date: Oct 13, 2026Type: Meeting mention
The Hearings Examiner conducted a public hearing regarding the Village at North Shore application (File No. SUB25-1008). The meeting included an overview of the application process and public testimony regarding the proposed development. The record was set to remain open for additional public comment and for the applicant to provide a response.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track City of Camas meetings, strategic plans, and budget discussions before the public bid appears.
How does the City of Camas approve procurement contracts and awards?
The City of Camas Public Works Department issues and manages Public Works solicitations, with the Public Works Director listed as the solicitation contact on posted RFP/RFQ documents. Vendors should follow the evaluation and submission instructions in each solicitation to identify award contacts and procedures.
Where can vendors find procurement policies and standard terms for the City of Camas?
The City of Camas publishes procurement terms, solicitation instructions, and standard contract terms within each posted RFP/RFQ PDF on cityofcamas.us. Vendors should consult the specific City of Camas solicitation PDF for binding contract terms, submission requirements, and contact details.