Summary
The buildings mechanical equipment and plumbing fixtures are at the end of serviceable life and will be replaced with new equipment per the Draw-ings and Specifications. A new source capture exhaust system is to be Installed. A new Energy Recovery Ventila-tion System with Distribution to new Air Handlers is to be Installed. A new Building Automation System is to be In-stalled to Allow the city to access, Control, and Monitor all Mechanical Equipment within the Building. Electrical Scope to consist of Disconnection/Reconnection of re-placed Mechanical Equipment and Upgrade to circuits
and wiring as necessary to accommodation the new
Equipment. In addition to MEP-Related Scope of Work
we have specified demolition of existing Half-Height Mez-
zanine Wall within the fire stations apparatus bay to re-
construct the wall providing an fully enclosed mezzanine
space.