Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
School mascot.
Total number of staff members.
Highest grade level offered.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Braggs Public Schools
Provide and install the attached kitchen equipment. Including worktable, cabinet base hinged doorsd; shelving, wall mounted; cook line; bun / sheet pan rack; range. 60", 10 open burners; tilting skillet braising pan, electric; blue hose gas connector kit; griddle. Electric, countertop; work table, stainless steel top; hand sink; work table, cabinet base hinged doors; three (3) compartment sink; work table, stainless steel top; wire shelving unit; hot food counter; flexible shield; all purpose counter with enclosed base; liquitec cold pan serving counter; flexible shield; liquitec cold pan serving counter; single tier display fixed sneeze guard; services: custom fabrication; bench & table set.
Posted Date
Jun 18, 2026
Due Date
Jul 9, 2026
Release: Jun 18, 2026
Braggs Public Schools
Close: Jul 9, 2026
Provide and install the attached kitchen equipment. Including worktable, cabinet base hinged doorsd; shelving, wall mounted; cook line; bun / sheet pan rack; range. 60", 10 open burners; tilting skillet braising pan, electric; blue hose gas connector kit; griddle. Electric, countertop; work table, stainless steel top; hand sink; work table, cabinet base hinged doors; three (3) compartment sink; work table, stainless steel top; wire shelving unit; hot food counter; flexible shield; all purpose counter with enclosed base; liquitec cold pan serving counter; flexible shield; liquitec cold pan serving counter; single tier display fixed sneeze guard; services: custom fabrication; bench & table set.
AvailableBraggs Public Schools
Replace the existing parking lot. Resurface the parking lot with new concrete; Roughly 18,500 sqft for main area; Roughly 2,500 sqft in front of school. Remove existing square tubing pipe/vehicle corral; Remove concrete vehicle bumpers; Excavate top layer of parking lot to meet elevations and needed drainage; Form sections of parking lot 6" thick; Lay 'A inch rebar in a grid of 2 - o.c.; Pour 4,000 psi concrete; Finish the concrete with a broom texture on surface; Remove forms and saw cut for stress relief; Install new square tubing pipe for parking guardrail; Pour concrete next to parking lot for a water drainage ditch; Excavate and remove dirt along road in front of school for new concrete parking; Clean up debris; Paint square tubing pipe; Stripe new parking areas.
Posted Date
Jun 18, 2026
Due Date
Jul 9, 2026
Release: Jun 18, 2026
Braggs Public Schools
Close: Jul 9, 2026
Replace the existing parking lot. Resurface the parking lot with new concrete; Roughly 18,500 sqft for main area; Roughly 2,500 sqft in front of school. Remove existing square tubing pipe/vehicle corral; Remove concrete vehicle bumpers; Excavate top layer of parking lot to meet elevations and needed drainage; Form sections of parking lot 6" thick; Lay 'A inch rebar in a grid of 2 - o.c.; Pour 4,000 psi concrete; Finish the concrete with a broom texture on surface; Remove forms and saw cut for stress relief; Install new square tubing pipe for parking guardrail; Pour concrete next to parking lot for a water drainage ditch; Excavate and remove dirt along road in front of school for new concrete parking; Clean up debris; Paint square tubing pipe; Stripe new parking areas.
AvailableBraggs Public Schools
Replacement of 20 HVAC.
Posted Date
Jun 3, 2025
Due Date
Jun 24, 2025
Release: Jun 3, 2025
Braggs Public Schools
Close: Jun 24, 2025
Replacement of 20 HVAC.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Braggs Public Schools
The board discussed and approved several items for the upcoming school year including the appointment of adjunct teachers, the authorization to operate under the 1080-hour requirement, and the adoption of an updated discipline matrix. Additionally, the board approved a coach's grid, a contract renewal for special education consulting services, an agreement for a school resource officer, a loan agreement for food service deficits, and a schedule of fundraisers. A superintendent's report was also provided.
The board meeting involved removing an individual from credit card accounts for both Activity and General Funds. The board tabled the discussion regarding the daily rate of pay for the Interim Superintendent. Additionally, the board conducted an executive session to interview candidates for the Superintendent/Principal position for the upcoming school year, but ultimately tabled the decision on hiring and potential extension of the search time period.
This document outlines the support service goals established by the Braggs Board of Education to ensure the successful functioning of the school system and to support its educational program. The primary objectives are to provide a safe and pleasant physical environment for teaching and learning, ensure safe transportation for students, and offer nutritious meals.
The board approved the consent agenda, including various fund encumbrances and financial reports. Significant actions included receiving bids and awarding $860,000 in General Obligation Combined Purpose Bonds to BOK Financial Securities, along with resolutions for bond issuance and designation as qualified tax-exempt obligations. Additionally, the board approved annual audit contracts, renewals for educational software, the Parents Bill of Rights policy, and various staffing contracts and re-hires for the upcoming school year. The board also accepted teacher resignations.
The board discussed several items for the 2024/2025 school year, including the authorization of personnel roles such as payroll clerk, treasurer, and purchasing agent. Key actions included the approval of adjunct instructor and teacher designations, hiring recommendations for various roles, and emergency certification for a counselor. Additionally, the board considered the adoption of the employee and student handbooks, the discipline matrix, the coaches grid, a contract for special education services, and a mandated communication tool.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Braggs Public Schools's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
7th-12th English/Language Arts Teacher and Counselor
Premium
Access the largest public sector contact database
© 2026 Starbridge