Golden Harbour Infrastructure Upgrades
Jul 31, 2026
Closes
Aug 27, 2026
Replace approx 5,000 lf, of water main ranging in sizes from 4” to 6”. Included with the water main replacement is abandonment of existing water mains, installation and reconnection of meters as well as additional civil upgrades including roadway, sidewalk and stormwater collection improvements.
