Partial Roof Replacement - 112 Maine Ave RFP
Feb 20, 2026
Closes
Sep 9, 2026
Work includes roof replacement (9,000sf+-) at the equipment maintenance; installation of pressure treated wood blocking at rakes and eaves; installation of #1 expanded polystyrene (eps) between ribs; installation of a layer of 1 2" high density fiberboard insulation over the existing roofing and secure to the deck with screws and stress plates; installation of a.060 adhered epdm membrane; flashing of all roof penetrations.
