Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
Total number of staff members.
Highest grade level offered.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Arlington Public Schools
The project consists of the demolition and replacement of approx. 166,485 SF of roofing at the existing Arlington High School. The work includes Removal and replacement of asphalt shingle roofing, including sheathing and rigid insulation, Replacement of single-ply membrane roofing, Demolition and replacement of gutters, Modifications to existing downspouts and the addition of one new downspout, including connection to existing tight line below grade and related concrete cutting and patching, Miscellaneous flashing and sheet metal work, Painting of roof hatches and miscellaneous rooftop equipment.
Posted Date
Apr 7, 2026
Due Date
May 21, 2026
Release: Apr 7, 2026
Arlington Public Schools
Close: May 21, 2026
The project consists of the demolition and replacement of approx. 166,485 SF of roofing at the existing Arlington High School. The work includes Removal and replacement of asphalt shingle roofing, including sheathing and rigid insulation, Replacement of single-ply membrane roofing, Demolition and replacement of gutters, Modifications to existing downspouts and the addition of one new downspout, including connection to existing tight line below grade and related concrete cutting and patching, Miscellaneous flashing and sheet metal work, Painting of roof hatches and miscellaneous rooftop equipment.
Arlington Public Schools
The project consists of demolition and replacement of approximately 50,000 sf. of roofing at the existing Presidents Elementary School (E.S.), various exterior building envelope improvements, and food service equipment improvements. The work includes but is not limited to the following scope: 1. Removal and replacement of asphalt shingle roofing. 2. Demolition of existing gutters and replacement of gutters. 3. Miscellaneous flashing and sheet metal work. 4. Replacement of wood and fiber cement plank & panels. 5. Replacement of exterior envelope sealants. 6. Prepping and painting of all of the building's exterior, non-masonry, surfaces. 7. Veneer concrete masonry (CMU) work including and installation of water repellants and anti-graffiti coatings. 8. Infill of an existing recessed loading dock. 9. Demolition and replacement of an existing cooler and freezer. 10. Demolition and replacement of a dishwasher and exhaust hood, including related ductwork revisions and miscellaneous ceiling and finish repairs.
Posted Date
-
Due Date
Apr 16, 2025
Arlington Public Schools
Close: Apr 16, 2025
The project consists of demolition and replacement of approximately 50,000 sf. of roofing at the existing Presidents Elementary School (E.S.), various exterior building envelope improvements, and food service equipment improvements. The work includes but is not limited to the following scope: 1. Removal and replacement of asphalt shingle roofing. 2. Demolition of existing gutters and replacement of gutters. 3. Miscellaneous flashing and sheet metal work. 4. Replacement of wood and fiber cement plank & panels. 5. Replacement of exterior envelope sealants. 6. Prepping and painting of all of the building's exterior, non-masonry, surfaces. 7. Veneer concrete masonry (CMU) work including and installation of water repellants and anti-graffiti coatings. 8. Infill of an existing recessed loading dock. 9. Demolition and replacement of an existing cooler and freezer. 10. Demolition and replacement of a dishwasher and exhaust hood, including related ductwork revisions and miscellaneous ceiling and finish repairs.
Arlington Public Schools
Misc. construction work.
Posted Date
Mar 25, 2025
Due Date
Apr 14, 2025
Release: Mar 25, 2025
Arlington Public Schools
Close: Apr 14, 2025
Misc. construction work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Generally not used; steer the request to a cooperative path instead.
Coops: Frequently procures through OMNIA Partners and Sourcewell; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
Arlington Public Schools, WA has no identifiable sole source contracts and operates in a competitive procurement environment. Redirect all sales efforts to cooperative purchasing channels.
Board meetings and strategic plans from Arlington Public Schools
The board of directors attended the Arlington High School graduation ceremony. The event included welcome remarks from the principal, a valedictorian address, musical performances by the school band and choir, and a formal certification of the graduation requirements for the Class of 2026. The ceremony concluded with the presentation of diplomas to 340 graduates.
The board conducted both a study session and a regular meeting. Key discussion topics included a review of the Continuity of Operations Plan, proposed AI language for procedural policy, and a retiree celebration. During the regular meeting, the board heard student presentations on a math stock market unit, introduced new student advisors, and honored retirees. The board also addressed several consent agenda items, approved a resolution honoring a student advisor, reviewed an annual conflict of interest report, and received an annual report from the Advisory Council for Education. Additionally, the board approved an interlocal agreement for School Resource Officer services, received an update on instructional cycles for professional learning communities, discussed budget development, and adopted revisions to the policy regarding meeting conduct, order of business, and quorum.
The Board conducted a study session and regular meeting. The study session covered district child nutrition programs, Post Middle School contingency planning, and the completion of the district office mural project. During the regular meeting, the Board recognized new assistant principals, reviewed reports on financial budgets, enrollments, and donations, and received presentations on the McKinney-Vento program, the integration of Artificial Intelligence into CTE frameworks, public information programs, and student withdrawal statistics. Additionally, the Board reviewed geographic attendance areas, deliberated on several board policy changes, and received an informational legislative update.
The board members attended the Weston High School Graduation Ceremony. The event featured opening remarks by the principal, messages from students and staff, and a speech from the Superintendent regarding hope and student accomplishment. The Superintendent certified that the graduates met all requirements, followed by the presentation of diplomas to the students.
The board meeting included a land acknowledgement, the pledge of allegiance, and roll call. Key actions and discussions included an amendment to the agenda to remove the 2026-27 student and staff fee schedule for a later date, a public comment regarding staff transitions, and the approval of the consent agenda. The Superintendent provided personnel updates, including new assistant principal appointments. Additionally, there were reports on donations to the Pioneer PTSA and the special education department, as well as a presentation on financial highlights of the current budget and a draft of the 2026-27 budget.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Arlington Public Schools's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge