CityPA
Jul 19, 2026
Closes
Aug 27, 2026
Wyndon Avenue Stormwater Repairs
The project is to replace the existing brick culvert with a culvert pipe. The work includes, but is not limited to, sawcutting and selective demolition; erosion and sediment control measures; traffic control measures; stormwater control measures; construct stormwater improvements; and pavement and site restoration.