Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project will construct a new, fully functional, industrial, compressed air plant in the controlled access B18 Complex including two centrifugal air compressors (4,000 HP), two industrial, natural gas-fired air heaters (18.1 MM BTU/hr / 55 MM BTU/hr), insulated specialty steel distribution piping (schedule 80-120), valves, and all associated controls and monitoring devices, integrated with the existing control system. The project also includes excavation, demolition/deconstruction and removal of two (2) existing, abandoned, industrial air compressors and existing air distribution piping, valves, and associated structural supports. Significant medium-voltage electrical work and industrial automation system controls replacement and commissioning will be included. Roof work, to include curbs for equipment is included. Minor interior demolition and architectural repairs will be required.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of approximately 265 LF of restored stream, reconnected floodplain, rebuilt bank, and in-stream structures.
Posted Date
Jul 12, 2025
Due Date
Jan 28, 2026
Release: Jul 12, 2025
Close: Jan 28, 2026
Construction of approximately 265 LF of restored stream, reconnected floodplain, rebuilt bank, and in-stream structures.
AvailableRelease: Jan 7, 2026
Close: Jan 28, 2026
Single Stream Recycling Service.
AvailableFall creek comprehensive stream corridor assessment study.
Posted Date
Dec 4, 2025
Due Date
Jan 8, 2026
Release: Dec 4, 2025
Close: Jan 8, 2026
Fall creek comprehensive stream corridor assessment study.
Procurement of consulting services for wetland and stream delineations for U.S. Army Corps of Engineers approved Clean Water Act 404 permitting purposes.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Procurement of consulting services for wetland and stream delineations for U.S. Army Corps of Engineers approved Clean Water Act 404 permitting purposes.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis