Work includes construction of a culvert replacement including full depth roadway reconstruction through project limits, traffic control, and site restoration.
Description: Work includes approx 478 LF of pre-construction internal cctv sewer pipe inspection; 258 LF of 20" special thickness class 50 ductile iron pipe; 258 LF of 20"x9.00mm cured in place pipe lining.
County · KS, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityME
Posted
Sep 28, 2026
Oct 26, 2026
Work includes construction of a culvert replacement including full depth roadway reconstruction through project limits, traffic control, and site restoration.
CityMO
Posted
Oct 5, 2026
Nov 3, 2026
The project consist of constructing a crossing across Pine Street and sidewalks connecting the PB Housing and Link Park.
CityMO
Posted
Oct 5, 2026
Nov 3, 2026
The project consist of constructing a crossing across Pine Street and sidewalks connecting the PB Housing and Link Park.
Wakarusa Watershed District Joint District 35
Special DistrictKS
Posted
Sep 29, 2026
Oct 23, 2026
The corrugated metal pipe currently in this crossing has rusted out and is failing after 50 years of use. The project involves removing the existing pipe and replacing it with a new corrugated steel pipe. The new pipe will be placed in the same location and position as the existing pipe. The old pipe is to be disposed of by the contractor. All excavations shall have a side slope no steeper than 1 horizontal to 1 vertical. All back fill must be placed in 6-inch lifts and fully compacted. Hand compaction is required along the pipe up to the haunch. Approx 114 CY Excavate pipe trench; 9 CY Hand Compacted backfill; 104 CY Machine compacted backfill; etc.