Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Supply and installation of 4,981 SF of Forbo Flowtex flooring.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project consists of a 1,168 SF lobby restroom remodel with a potential expansion to 3,983 SF to improve efficiency, service, capacity, and functionality. The project includes extending the remodel of existing lobby level restrooms. Remodel of lobby level, 2nd floor and 3rd floor restrooms along with the family restrooms, mother's room, accommodating sensory room, janitor's closets and corridors. The addition of restrooms for the 2nd and 3rd floor require modification of existing internal waste lines to handle increased capacity, plus a new sewer line on exterior of the building to tie into existing sewer manholes.
Posted Date
-
Due Date
Feb 24, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of a 1,168 SF lobby restroom remodel with a potential expansion to 3,983 SF to improve efficiency, service, capacity, and functionality. The project includes extending the remodel of existing lobby level restrooms. Remodel of lobby level, 2nd floor and 3rd floor restrooms along with the family restrooms, mother's room, accommodating sensory room, janitor's closets and corridors. The addition of restrooms for the 2nd and 3rd floor require modification of existing internal waste lines to handle increased capacity, plus a new sewer line on exterior of the building to tie into existing sewer manholes.
AvailableWork includes repair, replacement and installation of resilient floor covering.
Posted Date
Aug 25, 2025
Due Date
Jan 26, 2026
Release: Aug 25, 2025
Close: Jan 26, 2026
Work includes repair, replacement and installation of resilient floor covering.
AvailableThis RFP is for establishing contracts for flooring, carpeting, floor coverings, and product installation and repair services.
Posted Date
Jan 12, 2026
Due Date
Mar 27, 2026
Release: Jan 12, 2026
Close: Mar 27, 2026
This RFP is for establishing contracts for flooring, carpeting, floor coverings, and product installation and repair services.
AvailableConstruction of the Adult Detention Center Boiler Room Addition.
Posted Date
Dec 15, 2025
Due Date
Jan 21, 2026
Release: Dec 15, 2025
Close: Jan 21, 2026
Construction of the Adult Detention Center Boiler Room Addition.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →