Closing soon

Westshore Deep Manhole Revision

Description: This project includes the replacement of two manholes with pre-lined manholes and the installation of approx 147 lf of 8" PVC gravity sewer main. Restoration of approx 51 sq yd of HMA patching associated with the trenching area will be required. The existing sewer air intake structure will be relocated on-site, and approx 42 lf of underground 6" PVC air ducts installed to connect to the nearby new pre-lined manhole. Wastewater bypass pumping and traffic control will be required to complete the project.

Buyer
City of Moses Lake

City · WA, US

Released
Aug 12, 2026
Closes
Sep 1, 2026(9 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.