Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct an approx. 1,100 SF concrete masonry unit well building with associated mechanical, site piping, and site work. Supply and install an 800 HP lineshaft turbine pump and motor assembly. Electrical and control work shall be performed by others.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes parking structure membrane replacement project involving level 3e membrane work.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
Work includes parking structure membrane replacement project involving level 3e membrane work.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the following Work: Construction, test pumping, and sampling of an 18-inch diameter potable municipal sandstone well. Construction of 70-foot x 52-foot water treatment building with cast-in-place concrete foundation and floors, masonry walls, concrete plank ceiling and membrane roof; buried cast-in-place concrete detention tank; FRP and hollow metal doors and frames; louvers; plumbing; heating; ventilation; painting; interior and exterior lighting; electrical; process instrumentation and control; supervisory control and data acquisition (SCADA) system improvements; standby generator and automatic transfer switch; vertical turbine well pump, vertical turbine high lift pumps; process mechanical piping, valves, flowmeters, and appurtenances. Site work including 14-inch diameter water main and valves; 8-inch diameter sanitary sewer piping and associated manholes; two (2) 12,000-gallon nominal capacity buried precast concrete backwash detention tanks; site grading; concrete stoops and sidewalk; aggregate base course and asphalt pavement for driveway and parking areas; removal and reinstallation of existing chain link fence; erosion control; street restoration; and site restoration. All work shall be awarded under a single contract. Treatment equipment will be bid out in a separate bid package (Phase 2) after well construction has been completed. The anticipated substantial completion date is August 2027, and final completion date is May 2028.
Posted Date
Dec 23, 2025
Due Date
Jan 21, 2026
Release: Dec 23, 2025
Close: Jan 21, 2026
Project includes the following Work: Construction, test pumping, and sampling of an 18-inch diameter potable municipal sandstone well. Construction of 70-foot x 52-foot water treatment building with cast-in-place concrete foundation and floors, masonry walls, concrete plank ceiling and membrane roof; buried cast-in-place concrete detention tank; FRP and hollow metal doors and frames; louvers; plumbing; heating; ventilation; painting; interior and exterior lighting; electrical; process instrumentation and control; supervisory control and data acquisition (SCADA) system improvements; standby generator and automatic transfer switch; vertical turbine well pump, vertical turbine high lift pumps; process mechanical piping, valves, flowmeters, and appurtenances. Site work including 14-inch diameter water main and valves; 8-inch diameter sanitary sewer piping and associated manholes; two (2) 12,000-gallon nominal capacity buried precast concrete backwash detention tanks; site grading; concrete stoops and sidewalk; aggregate base course and asphalt pavement for driveway and parking areas; removal and reinstallation of existing chain link fence; erosion control; street restoration; and site restoration. All work shall be awarded under a single contract. Treatment equipment will be bid out in a separate bid package (Phase 2) after well construction has been completed. The anticipated substantial completion date is August 2027, and final completion date is May 2028.
AvailableWell #6 Well House Rehabilitation. The Project generally includes: the rehabilitation of the well, the installation of an emergency power source (backup generator), building upgrades, electrical upgrades, general site work, the installation of a concrete loading dock, the supply and installation of new valves, piping, and chemical feed equipment, as well as associated equipment and appurtenances.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Well #6 Well House Rehabilitation. The Project generally includes: the rehabilitation of the well, the installation of an emergency power source (backup generator), building upgrades, electrical upgrades, general site work, the installation of a concrete loading dock, the supply and installation of new valves, piping, and chemical feed equipment, as well as associated equipment and appurtenances.
AvailableProject is for the installation of new well houses and yard piping. Work for this project includes earthwork, well buildings, a gas chlorination system at POD-13, yard piping, station piping, drainage, head wall, manholes, and other water system appurtenances. It also contains primary electrical and secondary electrical work with a SCADA control system. Other miscellaneous work includes gravel surfacing, fencing and erosion control. For clearing, grubbing, earthwork, excavation, backfill, site grading, finish grading, site drainage, three (3) 30" culvert, yard and access road construction 1 ls, see outside link.
Posted Date
Dec 26, 2025
Due Date
Jan 28, 2026
Release: Dec 26, 2025
Close: Jan 28, 2026
Project is for the installation of new well houses and yard piping. Work for this project includes earthwork, well buildings, a gas chlorination system at POD-13, yard piping, station piping, drainage, head wall, manholes, and other water system appurtenances. It also contains primary electrical and secondary electrical work with a SCADA control system. Other miscellaneous work includes gravel surfacing, fencing and erosion control. For clearing, grubbing, earthwork, excavation, backfill, site grading, finish grading, site drainage, three (3) 30" culvert, yard and access road construction 1 ls, see outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →