Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the following Work: Construction, test pumping, and sampling of an 18-inch diameter potable municipal sandstone well. Construction of 70-foot x 52-foot water treatment building with cast-in-place concrete foundation and floors, masonry walls, concrete plank ceiling and membrane roof; buried cast-in-place concrete detention tank; FRP and hollow metal doors and frames; louvers; plumbing; heating; ventilation; painting; interior and exterior lighting; electrical; process instrumentation and control; supervisory control and data acquisition (SCADA) system improvements; standby generator and automatic transfer switch; vertical turbine well pump, vertical turbine high lift pumps; process mechanical piping, valves, flowmeters, and appurtenances. Site work including 14-inch diameter water main and valves; 8-inch diameter sanitary sewer piping and associated manholes; two (2) 12,000-gallon nominal capacity buried precast concrete backwash detention tanks; site grading; concrete stoops and sidewalk; aggregate base course and asphalt pavement for driveway and parking areas; removal and reinstallation of existing chain link fence; erosion control; street restoration; and site restoration. All work shall be awarded under a single contract. Treatment equipment will be bid out in a separate bid package (Phase 2) after well construction has been completed. The anticipated substantial completion date is August 2027, and final completion date is May 2028.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The construction of a water supply well at the station water treatment facility.
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
The construction of a water supply well at the station water treatment facility.
AvailableProvide construction services for well no. 3 at water treatment facility #2.
Posted Date
Dec 29, 2025
Due Date
Jan 30, 2026
Release: Dec 29, 2025
Close: Jan 30, 2026
Provide construction services for well no. 3 at water treatment facility #2.
AvailableProcurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Procurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
AvailableProject consists of providing all required materials, equipment and labor necessary to complete the construction of the well house and treatment for the phase 5 water system improvements. Generally, the project includes the construction of remaining work on the issue for bid plans other than the well, well pump, and the 250,000 gallon elevated storage tank for county.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
Project consists of providing all required materials, equipment and labor necessary to complete the construction of the well house and treatment for the phase 5 water system improvements. Generally, the project includes the construction of remaining work on the issue for bid plans other than the well, well pump, and the 250,000 gallon elevated storage tank for county.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis