Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of providing all required materials, equipment and labor necessary to complete the construction of the well house and treatment for the phase 5 water system improvements. Generally, the project includes the construction of remaining work on the issue for bid plans other than the well, well pump, and the 250,000 gallon elevated storage tank for county.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Premium
Access the largest public sector contact database
Release: Dec 10, 2025
Close: Jan 30, 2026
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
AvailableProject consists of replacing the existing main filter plant including ground storage reservoirs and booster pump station with water treatment plant 1 located at a new site. The project consists of turning well 9 site into water treatment plant 2. The project consists of work at the main filter plant site, water treatment plant 1 site, water treatment plant 2 site, well 4 site, well 5 site, well 8 site, well 9 site, and well 10 site. The work at the main filter plant site includes demolishing two ground storage reservoirs, main booster pump station, maintenance shop, and well 4 building.
Posted Date
Dec 3, 2025
Due Date
Jan 22, 2026
Release: Dec 3, 2025
Close: Jan 22, 2026
Project consists of replacing the existing main filter plant including ground storage reservoirs and booster pump station with water treatment plant 1 located at a new site. The project consists of turning well 9 site into water treatment plant 2. The project consists of work at the main filter plant site, water treatment plant 1 site, water treatment plant 2 site, well 4 site, well 5 site, well 8 site, well 9 site, and well 10 site. The work at the main filter plant site includes demolishing two ground storage reservoirs, main booster pump station, maintenance shop, and well 4 building.
AvailableProvide engineering services for water treatment plant phase iii pfas improvements.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
Provide engineering services for water treatment plant phase iii pfas improvements.
AvailableImprovements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.