Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of improvements to an existing municipal water well (well no. 5), welded steel water storage tank, booster pump system, hydropneumatic tank, emergency electrical generator, automatic transfer switch, site earthwork, surfacing, fencing, pipeline connection to the water distribution system, electrical building, electrical, controls, instrumentation, pg&e new service installation/connection and well no 1 destruction
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Construction of improvements to an existing municipal water well (well no. 5), welded steel water storage tank, booster pump system, hydropneumatic tank, emergency electrical generator, automatic transfer switch, site earthwork, surfacing, fencing, pipeline connection to the water distribution system, electrical building, electrical, controls, instrumentation, pg&e new service installation/connection and well no 1 destruction
AvailableConstruction of a transmission line, water well electrical service, and associated appurtenances.
Posted Date
Nov 18, 2025
Due Date
Dec 22, 2025
Release: Nov 18, 2025
Close: Dec 22, 2025
Construction of a transmission line, water well electrical service, and associated appurtenances.
AvailableWork includes approx 1,330 LF of 24" nominal diameter drill hole; 500 LF of 14" nominal diameter drill hole; 1,330 LF of 18" nominal diameter casing; 700 LF of 24" nominal diameter casing; 2,820 Sack of grouting; See outside link.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2025
Release: Nov 20, 2025
Close: Dec 16, 2025
Work includes approx 1,330 LF of 24" nominal diameter drill hole; 500 LF of 14" nominal diameter drill hole; 1,330 LF of 18" nominal diameter casing; 700 LF of 24" nominal diameter casing; 2,820 Sack of grouting; See outside link.
AvailableHighland City is soliciting bids for a construction contract to furnish and install chlorination equipment, electrical systems, and related facilities at two existing drinking water wells (Well #1 and Well #5) in Highland City, Utah. The work includes mobilization, piping modifications, installation of chlorination equipment and an electric actuator at Well #1, and construction of a 6 x 6 shed with required electrical and HVAC at both well sites. A pre-bid meeting is scheduled for 2025-12-16 and questions/submissions are to be submitted via the indicated procurement portal; submissions are due 2026-01-08 at 10:00 AM MT.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Highland City is soliciting bids for a construction contract to furnish and install chlorination equipment, electrical systems, and related facilities at two existing drinking water wells (Well #1 and Well #5) in Highland City, Utah. The work includes mobilization, piping modifications, installation of chlorination equipment and an electric actuator at Well #1, and construction of a 6 x 6 shed with required electrical and HVAC at both well sites. A pre-bid meeting is scheduled for 2025-12-16 and questions/submissions are to be submitted via the indicated procurement portal; submissions are due 2026-01-08 at 10:00 AM MT.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis