Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Morris County Municipal Utilities Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Morris County Municipal Utilities Authority
Professional services 2026, #01 Engineering Services - Water Division. #02 Engineering Services - Solid Waste. #03 Legal Counsel - Solid Waste & Water Divisions. #04 Legal Counsel - Labor & Personnel #05 Auditing Services. #06 Appraisal Services.
Posted Date
Jan 26, 2026
Due Date
Jan 16, 2026
Release: Jan 26, 2026
Morris County Municipal Utilities Authority
Close: Jan 16, 2026
Professional services 2026, #01 Engineering Services - Water Division. #02 Engineering Services - Solid Waste. #03 Legal Counsel - Solid Waste & Water Divisions. #04 Legal Counsel - Labor & Personnel #05 Auditing Services. #06 Appraisal Services.
Morris County Municipal Utilities Authority
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Release: Dec 10, 2025
Morris County Municipal Utilities Authority
Close: Jan 30, 2026
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
AvailableMorris County Municipal Utilities Authority
Installation of 690 LF of proposed DI water main. Various improvements of water mains through the construction of new 8" Ductile Iron Pipe Class 52 Potable Water Mains along with fittings, service connections and components. This new water main system shall connect to the existing infrastructure. As part of the project, the Contractor must perform a tie-in connection to the existing 8" DI pipe utilizing the necessary adaptors to make the watertight connection. Site work scope includes various traffic control devices, soil erosion and sediment control measures, excavation, restoration of asphalt pavement, various driveway restorations, curb restoration, and landscape restorations.
Posted Date
Dec 10, 2025
Due Date
Jan 6, 2026
Release: Dec 10, 2025
Morris County Municipal Utilities Authority
Close: Jan 6, 2026
Installation of 690 LF of proposed DI water main. Various improvements of water mains through the construction of new 8" Ductile Iron Pipe Class 52 Potable Water Mains along with fittings, service connections and components. This new water main system shall connect to the existing infrastructure. As part of the project, the Contractor must perform a tie-in connection to the existing 8" DI pipe utilizing the necessary adaptors to make the watertight connection. Site work scope includes various traffic control devices, soil erosion and sediment control measures, excavation, restoration of asphalt pavement, various driveway restorations, curb restoration, and landscape restorations.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.