Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Well #6 Well House Rehabilitation. The Project generally includes: the rehabilitation of the well, the installation of an emergency power source (backup generator), building upgrades, electrical upgrades, general site work, the installation of a concrete loading dock, the supply and installation of new valves, piping, and chemical feed equipment, as well as associated equipment and appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of well rehabilitation. The work for which proposals are invited consists of pulling and inspecting the pump, pump motor, and bowl assembly, televising the well, assessing the condition of the well equipment, and a report detailing recommended improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 22, 2026
Release: Dec 30, 2025
Close: Jan 22, 2026
Construction of well rehabilitation. The work for which proposals are invited consists of pulling and inspecting the pump, pump motor, and bowl assembly, televising the well, assessing the condition of the well equipment, and a report detailing recommended improvements.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation activities for well nos. 5, 8 & 10: remove vertical turbine pumping equipment remove down-hole equipment rehabilitate wells video inspection of wells rehabilitate/replace equipment.
Posted Date
Dec 26, 2025
Due Date
Jan 20, 2026
Release: Dec 26, 2025
Close: Jan 20, 2026
Rehabilitation activities for well nos. 5, 8 & 10: remove vertical turbine pumping equipment remove down-hole equipment rehabilitate wells video inspection of wells rehabilitate/replace equipment.
AvailableProcurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Procurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
AvailableThis project involves the construction of a new Construction of a new (replacement) groundwater well (Deep Well 6), and a monitoring well, including well drilling, casing and screen installation, well head detail, aquifer and well testing, site work (e.g., clearing and construction of a stormwater pond and outfall), and site controls necessary for stormwater control and disposal of drilling spoils and aquifer testing fluids.
Posted Date
Dec 10, 2025
Due Date
Jan 29, 2026
Release: Dec 10, 2025
Close: Jan 29, 2026
This project involves the construction of a new Construction of a new (replacement) groundwater well (Deep Well 6), and a monitoring well, including well drilling, casing and screen installation, well head detail, aquifer and well testing, site work (e.g., clearing and construction of a stormwater pond and outfall), and site controls necessary for stormwater control and disposal of drilling spoils and aquifer testing fluids.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →