Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project is for the installation of new well houses and yard piping. Work for this project includes earthwork, well buildings, a gas chlorination system at POD-13, yard piping, station piping, drainage, head wall, manholes, and other water system appurtenances. It also contains primary electrical and secondary electrical work with a SCADA control system. Other miscellaneous work includes gravel surfacing, fencing and erosion control. For clearing, grubbing, earthwork, excavation, backfill, site grading, finish grading, site drainage, three (3) 30" culvert, yard and access road construction 1 ls, see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Request for Proposal (RFP) titled "G-80 Point of Diversions #8 & #13 - Well Contract No. 2 - Well Equipping" is currently open and available, issued by the City of Gallup. This project involves the installation of deep well submersible pump assemblies within existing well casings at G-80 Point of Diversions #8 and #13. The work includes 4½″ O.D. J-55 steel column piping, check valves, electric cable, stainless steel air lines, centralizers, appurtenances, and the construction of a new well head at POD #13.
Posted Date
Dec 26, 2025
Due Date
Jan 28, 2026
Release: Dec 26, 2025
Close: Jan 28, 2026
The Request for Proposal (RFP) titled "G-80 Point of Diversions #8 & #13 - Well Contract No. 2 - Well Equipping" is currently open and available, issued by the City of Gallup. This project involves the installation of deep well submersible pump assemblies within existing well casings at G-80 Point of Diversions #8 and #13. The work includes 4½″ O.D. J-55 steel column piping, check valves, electric cable, stainless steel air lines, centralizers, appurtenances, and the construction of a new well head at POD #13.
AvailableWork includes approx 2,410 LF of 12" CL350 ductile iron pipe; 2 EA WWA C509 12" resilent wedge gate valve (MJxMJ) and valve box; 1 EA fire hydrant; 540 LF of 8" CL350 DIP waterline with fittings, buried. See attached file.
Posted Date
Dec 2, 2025
Due Date
Jan 15, 2026
Release: Dec 2, 2025
Close: Jan 15, 2026
Work includes approx 2,410 LF of 12" CL350 ductile iron pipe; 2 EA WWA C509 12" resilent wedge gate valve (MJxMJ) and valve box; 1 EA fire hydrant; 540 LF of 8" CL350 DIP waterline with fittings, buried. See attached file.
AvailableWastewater land application system including pump station and piping, 2,400 LF of 4" PVC force main, 5 sprinkler connection points and 2 portable irrigation guns.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Wastewater land application system including pump station and piping, 2,400 LF of 4" PVC force main, 5 sprinkler connection points and 2 portable irrigation guns.
AvailableCoachella Valley Water District is soliciting bids to upgrade Lift Station 80-03 (Cook Street), including construction of a new 16-foot-diameter wet well with pumps and piping, new gravity sewer lines and manholes, site grading/paving, odor control system, a new electrical room, and conversion of the existing dry well for emergency storage. The project is estimated at approximately $9,490,250 and will be awarded as a lump-sum construction contract; bidders must meet insurance requirements including Installation Floater/Builders Risk with Flood and Earthquake coverage. Bids are to be submitted electronically, with a pre-bid onsite meeting scheduled and a Q&A deadline prior to bid opening.
Posted Date
Jan 6, 2026
Due Date
Feb 24, 2026
Release: Jan 6, 2026
Close: Feb 24, 2026
Coachella Valley Water District is soliciting bids to upgrade Lift Station 80-03 (Cook Street), including construction of a new 16-foot-diameter wet well with pumps and piping, new gravity sewer lines and manholes, site grading/paving, odor control system, a new electrical room, and conversion of the existing dry well for emergency storage. The project is estimated at approximately $9,490,250 and will be awarded as a lump-sum construction contract; bidders must meet insurance requirements including Installation Floater/Builders Risk with Flood and Earthquake coverage. Bids are to be submitted electronically, with a pre-bid onsite meeting scheduled and a Q&A deadline prior to bid opening.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis