Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Wastewater land application system including pump station and piping, 2,400 LF of 4" PVC force main, 5 sprinkler connection points and 2 portable irrigation guns.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work related to the stormwater pump station includes installing new stormwater pumps, influent manholes, wetwell, additional manholes, platform, gravity storm drain, outfall, and other site improvements and civil work. Work related to the wastewater pump station includes installing new wastewater pumps, influent manhole, wetwell, valve vault, flow meter vault, new force main and other site improvements and civil work. It is anticipated stormwater pump station work to occur first and the wastewater pump station to follow
Posted Date
Dec 18, 2025
Due Date
Jan 20, 2026
Release: Dec 18, 2025
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work related to the stormwater pump station includes installing new stormwater pumps, influent manholes, wetwell, additional manholes, platform, gravity storm drain, outfall, and other site improvements and civil work. Work related to the wastewater pump station includes installing new wastewater pumps, influent manhole, wetwell, valve vault, flow meter vault, new force main and other site improvements and civil work. It is anticipated stormwater pump station work to occur first and the wastewater pump station to follow
AvailableThe City of Pacific Grove requests sealed bids for wastewater pump station services for the 15.5 Crespi Pond Pump Station, performed per the project plans and specifications. This is a public works contract requiring contractor/subcontractor registration with the California Department of Industrial Relations and payment of Monterey County prevailing wages; award to the lowest responsible bidder.
Posted Date
Dec 3, 2025
Due Date
Jan 22, 2026
Release: Dec 3, 2025
Close: Jan 22, 2026
The City of Pacific Grove requests sealed bids for wastewater pump station services for the 15.5 Crespi Pond Pump Station, performed per the project plans and specifications. This is a public works contract requiring contractor/subcontractor registration with the California Department of Industrial Relations and payment of Monterey County prevailing wages; award to the lowest responsible bidder.
AvailableProject includes wastewater pump station instrumentation and communication service. See outside link.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Project includes wastewater pump station instrumentation and communication service. See outside link.
AvailableReplacement of the sarah fisher wastewater pump station. The project will involve installing two new submersible pumps, an 8’ diameter wet well, 6'x7' valve vault, generator, transformer relocation, and new electrical/controls at the pump station. Approx., 600' of 10" gravity sewer will be installed in a new sewer easement from the existing lift station to the new station located along 12 mile road. Also, 2,600' of 6" force main will be installed primarily through horizontal directional drilling from the new station to the outlet manhole. The force main installation will involve crossing beneath pebble creek within a sewer easement adjacent to the road right-of-way.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
Replacement of the sarah fisher wastewater pump station. The project will involve installing two new submersible pumps, an 8’ diameter wet well, 6'x7' valve vault, generator, transformer relocation, and new electrical/controls at the pump station. Approx., 600' of 10" gravity sewer will be installed in a new sewer easement from the existing lift station to the new station located along 12 mile road. Also, 2,600' of 6" force main will be installed primarily through horizontal directional drilling from the new station to the outlet manhole. The force main installation will involve crossing beneath pebble creek within a sewer easement adjacent to the road right-of-way.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →