Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of the sarah fisher wastewater pump station. The project will involve installing two new submersible pumps, an 8’ diameter wet well, 6'x7' valve vault, generator, transformer relocation, and new electrical/controls at the pump station. Approx., 600' of 10" gravity sewer will be installed in a new sewer easement from the existing lift station to the new station located along 12 mile road. Also, 2,600' of 6" force main will be installed primarily through horizontal directional drilling from the new station to the outlet manhole. The force main installation will involve crossing beneath pebble creek within a sewer easement adjacent to the road right-of-way.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Pacific Grove requests sealed bids for wastewater pump station services for the 15.5 Crespi Pond Pump Station, performed per the project plans and specifications. This is a public works contract requiring contractor/subcontractor registration with the California Department of Industrial Relations and payment of Monterey County prevailing wages; award to the lowest responsible bidder.
Posted Date
Dec 3, 2025
Due Date
Jan 22, 2026
Release: Dec 3, 2025
Close: Jan 22, 2026
The City of Pacific Grove requests sealed bids for wastewater pump station services for the 15.5 Crespi Pond Pump Station, performed per the project plans and specifications. This is a public works contract requiring contractor/subcontractor registration with the California Department of Industrial Relations and payment of Monterey County prevailing wages; award to the lowest responsible bidder.
Premium
Access the largest public sector contact database
This project consists of the replacement of the existing pumps at the influent pump station. This project will also include coating of the wet well and all pump station piping. Electrical components will also be replaced and include the installation of new variable frequency drives.
Posted Date
Nov 3, 2025
Due Date
Dec 11, 2025
Release: Nov 3, 2025
Close: Dec 11, 2025
This project consists of the replacement of the existing pumps at the influent pump station. This project will also include coating of the wet well and all pump station piping. Electrical components will also be replaced and include the installation of new variable frequency drives.
Sealed-bid construction for upgrades to two wastewater pump stations: replacement of pumps and discharge piping, addition of standby generators, new control panels and canopies, sitework, and associated pump station work. Requires Municipal and Public Works contractor license for bids ≥ $50,000, bid bond (5%), performance and payment bonds (100%), compliance with Davis‑Bacon and other federal CDBG‑DR requirements, 240-calendar-day completion, and active UEI prior to award.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Sealed-bid construction for upgrades to two wastewater pump stations: replacement of pumps and discharge piping, addition of standby generators, new control panels and canopies, sitework, and associated pump station work. Requires Municipal and Public Works contractor license for bids ≥ $50,000, bid bond (5%), performance and payment bonds (100%), compliance with Davis‑Bacon and other federal CDBG‑DR requirements, 240-calendar-day completion, and active UEI prior to award.
AvailableConstruct new plant chlorine contact tanks and effluent pump station including associated yard piping, civil, structural, mechanical, plumbing, electrical, equipment installation, and instrumentation for a completely operational system.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
Construct new plant chlorine contact tanks and effluent pump station including associated yard piping, civil, structural, mechanical, plumbing, electrical, equipment installation, and instrumentation for a completely operational system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.