Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Rockingham County
This project consists of the replacement of the existing pumps at the influent pump station. This project will also include coating of the wet well and all pump station piping. Electrical components will also be replaced and include the installation of new variable frequency drives.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Hayden Area Regional Sewer Board
Construct new plant chlorine contact tanks and effluent pump station including associated yard piping, civil, structural, mechanical, plumbing, electrical, equipment installation, and instrumentation for a completely operational system.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Hayden Area Regional Sewer Board
Close: Dec 18, 2025
Construct new plant chlorine contact tanks and effluent pump station including associated yard piping, civil, structural, mechanical, plumbing, electrical, equipment installation, and instrumentation for a completely operational system.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Smithland
Purchase and installation of two new filters in the filtration / U.V. building, improvements to the influent pump station, and related appurtenances on the wastewater treatment plant site.
Posted Date
Dec 1, 2025
Due Date
Dec 16, 2025
Release: Dec 1, 2025
City of Smithland
Close: Dec 16, 2025
Purchase and installation of two new filters in the filtration / U.V. building, improvements to the influent pump station, and related appurtenances on the wastewater treatment plant site.
AvailableAlbany Port District
Construction of both a packaged wastewater treatment plant and fire pump house (2-part bid). See outside link.
Posted Date
Oct 20, 2025
Due Date
Dec 18, 2025
Release: Oct 20, 2025
Albany Port District
Close: Dec 18, 2025
Construction of both a packaged wastewater treatment plant and fire pump house (2-part bid). See outside link.
AvailableCity of Port Townsend
This contract includes, but is not limited to, the following work: rehabilitation of the WWTP influent pump station wet well, including surface prep and coating, replacement of pump discharge piping and controls, replacement of influent manhole, bypass pumping, electrical upgrades, odor control ducting and fan replacement, and other work.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
City of Port Townsend
Close: Dec 18, 2025
This contract includes, but is not limited to, the following work: rehabilitation of the WWTP influent pump station wet well, including surface prep and coating, replacement of pump discharge piping and controls, replacement of influent manhole, bypass pumping, electrical upgrades, odor control ducting and fan replacement, and other work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →